Melbourne Main Sewer Replacement
MelbourneVictoria
Australia
2009
2012
Lucy Loo the EPB tunnel boring machine, 2.952 m diameter; Akkerman ground boring machine supplied by Lovat.
2.2 km
$220 million
AUD
Connell Wagner
[127437] John Holland Tunnelling Construction [123101] GHD Pty Ltd Designer [127436] Aurecon Australia Pty Ltd Project Manager