A Great Southern Press Site
Username:   Password: Forgot Password?
Advanced Search.

Melbourne Main Sewer Replacement

Melbourne
Victoria
Australia
2009
2012
Lucy Loo the EPB tunnel boring machine, 2.952 m diameter; Akkerman ground boring machine supplied by Lovat.
2.2 km
$220 million

AUD

Connell Wagner
[127437] John Holland Tunnelling Construction [123101] GHD Pty Ltd Designer [127436] Aurecon Australia Pty Ltd Project Manager

Related articles

· Final tunnel completed for Melbourne Main Sewer Replacement Tue, 3 May 2011
· Networking: the future of tunnelling Mon, 18 April 2011
· Breakthrough under Port Melbourne Mon, 28 June 2010

Legend
cf
: cubic feet
cm
: cubic metres
t
: tonne
B
: billion
MM
: million
bbl
: barrel
MW
: mega watts
boe
: barrels of oil equivalent
/d
: per day
/a
: per annum
GJ
: giga joules
psi
: pounds per square inch
TJ
: tera joules
PJ
: peta joules
EJ
: exa joules
: Celsius

Enter your details here to subscribe to the free Trenchless Australasia Online Update.

Add to Jobs newsletter.
I would like to receive exclusive discounts and invitations to industry events and other relevant items.

Please enter the word in the image below:

Basket is empty.