Approximately 80 m of the 2,925 m of pipe to be constructed in the project is to be directional drilled, with the remaining 2,845 m to be installed by open trenching.
Tenderers are required to attend a compulsory workshop and a compulsory site inspection.
Tender submissions must be lodged by 1 September 2010.