The contract covers the supply and installation of 66 m long PE SDR13.6 pipe with a diameter of 280 mm by directional drilling, as well as the installation of 49 m of 300 mm RCRRJ pipe and 44 m of 375 mm diameter RCRRJ pipe by open trenching. Included are three 1,050 mm and one 1,200 mm diameter precast manholes, two catchpits, grass swale, subsoil drain, reinstatement and the sliplining of 88 m into an existing damaged 225-300 mm diameter pipeline.
The new pipeline will be constructed between Penguin Street and Barrier View Road, and the sliplining of existing stormwater pipe along the southern boundary of 60 Barrier View Road and 12 Penguin Street.
Tenders close at 2:00 pm on 13 September 2010 and must be lodged in the RDC Public Tender box in a sealed envelope, clearly marked as a “÷Tender for Contract No. C2010.037′.