HDD, Microtunnelling, Pipe jacking, Tunnelling, Utility location

Trenchless services sought in NSW

Sydney Water is seeking a professional services contractor to deliver the design, technical specifications and related services for timely renewal of stormwater assets.

The broad scope of work involves the renewal of 3.85 km of stormwater assets and building 42 new maintenance holes.

The tender documents are available for purchase and downloading from Sydney Water’s tendering website.

The tender closes on Thursday 28 March 2013 at 9.30 am.

For further details see the tender listing.

Sydney Water has released another tender, for horizontal drilling and microtunnelling services, closing on 21 March 2013 at 9:30 am.

The tender involves construction of rising main SP0614 (Smeaton Grange) and wastewater pipeline from SP1045 (Tahmoor) using directional drilling, horizontal boring and microtunnelling.

A mandatory pre-tender site inspection will be conducted at Smeaton Grange and Tahmoor on 7 March 2013.

Prospective tenderers are advised to email {encode=”Qemal.Selmoni@sydneywater.com.au” title=”Qemal.Selmoni@sydneywater.com.au”} for details of the site inspection location.

See the listing for further details.

Send this to a friend