tower banner (left) Jan 2021
tower ad (right) jan 2021

TBM travels to Australia

Snowy Hydro Limited said its tunnel boring machine (TBM) 1 is on its way to Australia following factory acceptance testing.

At 205 m long and 11 m in diameter, the TBM is considered large by global standards and has been designed specifically to tunnel on an incline.

In a social media post, Snowy Hydro Limited has shared images of the TBM’s construction, thanking Herrenknecht AG for the kit.

Image courtesy of Snowy Hydro Limited.

The completion of the TBM marks another milestone between Snowy Hydro Limited and its principal contractor Future Generation Joint Venture, comprising Webuild and Clough.

For more information visit the Snowy Hydro Limited website.

If you have news you would like featured in Trenchless Australasia contact Journalist Sophie Venz at svenz@gs-press.com.au

Show more

Related articles

Back to top button
Close
Close