tower banner (left) Jan 2021
tower ad (right) jan 2021

Interflow turns 84

The company is looking back on its numerous achievements while it celebrates its 84th year in operation this week.

To celebrate, Interflow says it is taking a “walk down memory lane” by looking back at major milestones the organisation has achieved.

In a social media post, Interflow shared an image of the very first project undertaken by the company – that at the time was known as General Constructions.

The project was the construction of the Northbridge sewer reticulation system, when trenches were excavated using picks and shovels.

“A far cry from the trenchless technology and high-tech robotics we use today, but a vital part of our history nonetheless”.

For more information visit the Interflow website.

If you have news you would like featured in Trenchless Australasia contact Assistant Editor Sophie Venz at svenz@gs-press.com.au

Show more

Related articles

Back to top button
Close
Close