• About
  • Advertise
  • Contact
  • Subscribe
  • List Stock
  • Business Directory
Saturday, April 11, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
Home News

A holistic approach to HDD project management

by Vivien Topalovic
December 17, 2023
in Australia, Company news, Featured, From the magazine, HDD, HDD, News
Reading Time: 6 mins read
A A
Maxibor Australia

The pipe pull phase is the culmination of the HDD project. Image: Maxibor.

Maxibor Australia chief executive officer (CEO) Rodney O’Meley spoke to Trenchless Australasia on minimising risk and optimising outcomes for stakeholders in horizontal directional drilling (HDD) projects.

With over 40 years of experience under his belt, O’Meley combines his hands-on ownership with an experienced operational management team.  

The Maxibor operational management team also has a wealth of experience in the design and delivery of HDD projects spanning several decades.

HDD risks

The inherent risk of an HDD project is largely concentrated at the geotech, design and pipeline installation stages of the project.

Inherent risk is the level of risk when no action has been taken to mitigate or reduce the risk. It is the risk before any treatments or controls are put in place to mitigate the risk. Residual risk is the level of risk that remains after controls have been put in place.

Developing mitigation actions to respond to those activities with higher inherent risk will substantially benefit from the involvement of people with wide experience in solving a variety of HDD project challenges. Maxibor Australia’s perspective on the management of HDD risks involves multiple stages.

Maxibor Australia
A generic assessment of the inherent risk around key HDD project activities. Image: Maxibor.

Ownership commitment – O’Meley’s direct involvement as both CEO and owner demonstrates a high level of commitment and passion for the HDD business. This personal and financial stake in the company drives a strong commitment to its growth and success, winning the confidence in all project stakeholders..

Risk mitigation – The inherent risk in HDD projects, especially during geotechnical investigation, pilot hole, and pipe pull stages, is well-recognised. O’Meley’s involvement in these critical phases allows for real-time assessment of risks and the implementation of mitigation measures. 

Cost management – Recognising that pipeline installation accounts for a significant portion of HDD project costs (circa 65 per cent), O’Meley’s experience and decision-making can lead to more productive operations, reducing labour and equipment expenses.

Operational expertise – The operational management team complements O’Meley’s ownership. Their specialised expertise in areas such as design, estimating, project management, commercials and HSEQ ensures the day-to-day efficiency and safety of HDD projects.

Maxibor applies this approach to the extreme inherent risk areas of geotech investigation, installation – pilot hole, and installation – pipe pull. 

Geotech Investigation

Geotechnical investigation is a critical phase in HDD projects, as it lays the foundation for informed decision-making and risk management. Here’s how Maxibor manages this phase effectively:

Identifying hazards – The geotechnical investigation is essential for identifying conceivable ground-related hazards. This involves assessing geological conditions, soil types, rock formations, caverns, and potential obstacles in the drilling path.

Risk assessment – Maxibor assesses these hazards as project risks, quantifying the level of risk associated with each identified hazard. This step helps prioritise risk mitigation efforts based on their potential impact on the project.

Risk mitigation planning – The company identifies required actions to manage ground risks effectively. This includes developing strategies to navigate challenging geological conditions, such as fractured rock drilling techniques or the use of specialised tooling.

Documentation and linkages – The geotechnical investigation informs the development of design and construction documentation. These documents include plans and procedures tailored to address specific ground conditions and associated risks. They are linked to the construction program to ensure seamless execution.

Installation – The pilot hole is a critical component of HDD projects, setting the stage for the subsequent drilling and pipe installation phases. Here’s how Maxibor manages the pilot hole process. 

Precision – Maxibor emphasises precision and accuracy during the pilot hole process. This involves the use of advanced steering and guidance equipment to navigate through complex subsurface conditions, including rock formations, utilities, and environmental obstacles.

Maxibor Australia
Maxibor Owner and CEO Rodney O’Meley. Image: Maxibor.

Environmental impact mitigation – Maxibor minimises the environmental impact by starting with a smaller-diameter borehole during the pilot hole phase. This reduces disruption to the surrounding area and lessens the likelihood and impact of environmental damage.

Subsurface assessment – The pilot hole serves as an essential tool for assessing subsurface conditions. It helps identify potential obstructions, assess ground conditions, and make necessary adjustments before proceeding to the reaming and pipe pull stages. This proactive approach reduces the risk of unexpected challenges during subsequent phases.

Efficiency and cost savings – A well-executed pilot hole not only ensures accuracy but also increases project efficiency. It reduces the time and effort required for reaming and pipe installation, ultimately leading to cost savings in terms of labour and equipment usage.

Installation – Pipe pull 

The pipe pull phase is the culmination of the HDD project, where the pipeline is pulled through the drilled borehole. Maxibor pays particular attention to this phase for a successful project completion.

Alignment and precision – The alignment of the pipeline during the pull is crucial. Maxibor ensures that the pipeline aligns precisely with the intended path established by the pilot hole. This precision avoids issues such as misalignment, bends, or kinks that could affect the pipeline’s performance or durability.

Friction reduction – Reducing friction and resistance during the pipe pull is vital to prevent damage to the pipeline, drilling tooling, and the borehole itself. Maxibor uses proper lubrication techniques and closely monitors the pulling force to ensure a smooth and controlled pull.

Quality assurance – The pipe pull phase serves as a quality assurance checkpoint. It allows for a final inspection of the pipeline to identify any damage or defects that may have occurred during the installation process. Any issues are addressed before the project is considered complete.

Efficiency – Efficient pipe pulls help control project costs by reducing labour and equipment expenses. They also minimise potential delays associated with rework or corrections, contributing to overall project efficiency.

Maxibor’s approach to HDD projects emphasises the meticulous management of higher inherent risk areas such as geotechnical investigation, pilot hole drilling, and pipe pull installation. 

By integrating ownership thinking, technical expertise, risk assessment, and mitigation strategies into these critical phases, Maxibor optimises project outcomes while ensuring precision, efficiency, and environmental responsibility. 

This comprehensive approach demonstrates the company’s commitment to delivering successful HDD projects that meet the needs of all stakeholders.

For more information, visit Maxibor’s website.

This article featured in the December edition of Trenchless Australasia. 

Subscribe to Trenchless Australasia for the latest project and industry news.

Tags: horizontal directional drillingMaxibor Australia
13

$10,000

POA

(HIRE)

DIGGA PD50

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
5

$2,875

POA

(HIRE)

2014 DIGGA PD3

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
4

$1,800

POA

(HIRE)

DIGGA CORE BARREL CB100

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
1

$1,690

TANNERTRACK - Hydraulic Post Hole Digger - Many auger sizes available

  • » Listing Type: New
Location marker The shape of a location marker

Pakenham, VIC

03 8547 8769
MORE DETAILS
18

$62,950

2011 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
19

$82,950

2018 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
6

$1,650

POA

(HIRE)

2015 DIGGA CB01

  • » Listing Type: Used
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
Premium Ad
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sunshine West, VIC

03 9999 3372
MORE DETAILS
21

$320,000

2006 ATLAS COPCO E2C

  • » Listing Type: Used
  • » Category: Carrier Mounted
Location marker The shape of a location marker

Dubbo, NSW

02 8315 0022
MORE DETAILS
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sydney, NSW

02 8999 7036
MORE DETAILS
6

$1,210,000

XCMG XR240E ROTARY PILING RIG

  • » Listing Type: New
Location marker The shape of a location marker

Brisbane City, QLD

07 3177 1695
MORE DETAILS
6

$2,395

POWERTECH CORE DRILL 352D

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS

Related Posts

Watermain installation at Lethbridge in Victoria.

Latest trenchless tenders drop for Yass, Bankstown, Manor Lakes, Laverton North

by Staff Writer
April 9, 2026

Trenchless Australasia has teamed up with Australian Tenders to bring readers the latest trenchless tenders.   North East Water Minor...

The Picote’s Flexi-Sliplining system being deployed.

First ever Picote Flexi-Sliplining installation made in Australasia

by Staff Writer
April 7, 2026

Plumbtrax Infrastructure Services has successfully completed the first installation of Picote Flexi-Sliplining technology. It marks a significant milestone for the...

A giant gantry lowers a TBM cutterhead into the launch box.

Giant cutterhead craned into place for T2D TBMs

by Staff Writer
April 2, 2026

The final piece of the road corridor that will link Adelaide’s north to the south is another step closer to...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Trenchless Australasia is the leading source of news and information in Australia and New Zealand. In addition to being the official publication of the Australasian Society for Trenchless Technology (ASTT) it is also the official media partner of the biggest specialist trenchless technology event in the Southern Hemisphere, No-Dig Down Under.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Us

  • Advertise
  • About
  • Contact
  • Subscribe
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • From the magazine
  • News
  • Featured
  • Utility location
  • Rehabilitation

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
  • Advertise
  • About
  • List Stock
  • Business Directory
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited