• About
  • Advertise
  • Contact
  • Subscribe
  • List Stock
  • Business Directory
Saturday, April 11, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
Home

A new frontier in HDD

by Staff Writer
June 2, 2011
in From the magazine
Reading Time: 3 mins read
A A

The Tasmanian Gas Pipeline (TGP) is the natural gas transmission pipeline which transports gas from Longford in Victoria to Tasmania. The 734 km subsea and onshore pipeline was commissioned in 2002.

Today, the pipeline and associated assets are managed and operated by Tas Gas Networks on behalf of owner TGP.

The pipeline provides the only supply of natural gas to Tasmania, and since it was commissioned in 2002 has provided Tasmanians with an alternative to hydro-generated electricity.

Construction of the Pipeline

Following rigorous engineering, environmental and heritage surveys and studies and pending approvals, construction of the TGP began in 2001.

The $A350 million project featured 430 km of onshore pipeline, a 305 km pipeline across Bass Strait and conversion of the Bell Bay Power Station to a gas-fired facility.

The benefits of bringing natural gas to Tasmania were many. With the state’s hydro-powered resources at capacity, natural gas would provide private and commercial users with an alternative, economical resource which would reduce costs, encourage the expansion of existing businesses and spur investment in new industries which use gas.

The pipeline’s planned route would see it cross under the Tamar River, near Bell Bay, and continue to Rosevale, near Launceston. It was here that Trenchless Technology was employed to achieve the best environmental outcomes for the region, and the project.

Trenchless Technology shines

It was decided that the best way for the pipeline to cross the Tamar River would be underneath it, with horizontal directional drilling (HDD) to be utilised to clear a path for the pipeline.

Drilling on what was one of the world’s longest under river drilled crossings began in late February on the east side of the Tamar River, near the Bell Bay Power Station.

The 2,046 m curved, underground drill hole punched through the ground at Rowella, on the west bank of the Tamar River, at around 5 am on Friday 22 March 2002. The drill rig used at the Tamar River had a pull-back capacity of 300 tonnes and the curved drill hole reached 86 metres beneath the bed of the river.

Innovative technique

A further 11 rivers in northern Tasmania were then crossed using a horizontal directional drill. At the time, this environmentally-friendly drilling technique had been used regularly in the pipeline industry to tunnel underneath major rivers and sand dunes without disturbing the above ground environment.

The drills were undertaken by construction contractor McConnell Dowell, who sub-contracted the river drills to joint venture partners, Stockton (a drilling company owned by McConnell Dowell) and Lucas, Australia’s largest directional drilling company.

Duke Energy International’s TGP Project Manager Carl Fisher said that the successful “÷punch-through’ of the Tamar River was greeted with great excitement by Duke Energy and the pipeline industry.

“The Tamar River crossing has been a terrific achievement for many reasons,” Carl said. “Not only does this represent a record in Australia for its length, but the work was completed in excellent time.

“Stockton Lucas set an outstanding pace, completing 12 major underground river crossings in just seven weeks using four drill rigs.”

Major works

Following these drills, construction of the TGP continued. At the time of printing this article, approximately 170 km of pipe had been laid on the bed of Bass Strait, and more than 60 km had been buried onshore in Tasmania, representing approximately 30 per cent of the TGP.

13

$10,000

POA

(HIRE)

DIGGA PD50

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
5

$2,875

POA

(HIRE)

2014 DIGGA PD3

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
4

$1,800

POA

(HIRE)

DIGGA CORE BARREL CB100

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
1

$1,690

TANNERTRACK - Hydraulic Post Hole Digger - Many auger sizes available

  • » Listing Type: New
Location marker The shape of a location marker

Pakenham, VIC

03 8547 8769
MORE DETAILS
18

$62,950

2011 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
19

$82,950

2018 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
6

$1,650

POA

(HIRE)

2015 DIGGA CB01

  • » Listing Type: Used
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
Premium Ad
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sunshine West, VIC

03 9999 3372
MORE DETAILS
21

$320,000

2006 ATLAS COPCO E2C

  • » Listing Type: Used
  • » Category: Carrier Mounted
Location marker The shape of a location marker

Dubbo, NSW

02 8315 0022
MORE DETAILS
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sydney, NSW

02 8999 7036
MORE DETAILS
6

$1,210,000

XCMG XR240E ROTARY PILING RIG

  • » Listing Type: New
Location marker The shape of a location marker

Brisbane City, QLD

07 3177 1695
MORE DETAILS
6

$2,395

POWERTECH CORE DRILL 352D

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS

Related Posts

Attendees at No-Dig Down Under inspect drill rigs.

No Missing No-Dig

by Staff Writer
March 26, 2026

International No-Dig Auckland provides an unparalleled opportunity to connect with the global trenchless technology industry. Hosted each year in a...

Edge Underground is comfortably working at 1830mm, with plans for future development.

Edge Underground’s diameter evolution

by Staff Writer
March 23, 2026

From the beginning, Stuart Harrison and the Edge Underground team built their reputation on being able to repeatably and accurately...

The RCX100 camerahead is a 1080p high definition pan-tilt zoom camera.

Inspection and profiling, simplified

by Staff Writer
March 20, 2026

For decades, pipeline inspection has followed a familiar rhythm: complete a visual CCTV inspection, pack up, then return with separate...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Trenchless Australasia is the leading source of news and information in Australia and New Zealand. In addition to being the official publication of the Australasian Society for Trenchless Technology (ASTT) it is also the official media partner of the biggest specialist trenchless technology event in the Southern Hemisphere, No-Dig Down Under.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Us

  • Advertise
  • About
  • Contact
  • Subscribe
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • From the magazine
  • News
  • Featured
  • Utility location
  • Rehabilitation

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
  • Advertise
  • About
  • List Stock
  • Business Directory
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited