• About
  • Advertise
  • Contact
  • Subscribe
  • List Stock
  • Business Directory
Sunday, April 12, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
Home News

A staple in trenchless technology

by Vivien Topalovic
October 14, 2023
in Australia, Company news, Featured, From the magazine, Installation, Microtunnelling, Microtunnelling, News, Trenchless Solutions
Reading Time: 3 mins read
A A
Pezzimenti Trenchless

Pezzimenti Trenchless has showcased the strength of microtunnelling through its work on a sewerage project.

Over the last ten years, there has been an uptick in microtunnelling across many infrastructure projects, as education and awareness around the technique continues to grow.

Pezzimenti Trenchless Director Joe Pezzimenti spoke to Trenchless Australasia about the positive impact of the technique, as seen through a recent sewerage project in Beveridge, Victoria.

The Rankin Street sewerage project involves construction of two new sewer mains as well as upgrading the Mandalay sewer pump station, and ultimately improve the network in Beveridge.

Pezzimenti Trenchless
The Rankin Street sewerage project involves construction of two new sewer mains as well as upgrading the Mandalay sewer pump station.

Awarded by Yarra Valley Water, construction is being done by MFJ Constructions, with Pezzimenti Trenchless completing drilling works on the branch sewer, which is situated from Lewis Street to the Mandalay sewer pump station.

For Pezzimenti Trenchless, the scope of work included the installation of a 530 outside diameter (OD) glass reinforced plastic (GRP) pipe, with the 1500m sewer constructed through microtunnelling, with shafts every 100m.

Due to the depth of the sewer line, microtunnelling was the right method of choice for the job. It is often seen as an efficient and cost-effective method, as it requires less resources than traditional methods.

It also causes minimal disruption to the environment surrounding the job, making it ideal for larger infrastructure projects, such as sewerage projects.

Pezzimenti Trenchless
Pezzimenti Trenchless completed drilling works on the branch sewer.

While the benefits of microtunnelling have been heralded through many projects, the technique has come a long way.

“Ten years ago, this job might not have ever been designed this way to do,” Joe said.

“Microtunnelling in the trenchless industry in the last decade has come a long way to actually have confidence to design these types of jobs.  Water companies, engineers and designers have more confidence, not just in our method, but in microtunnelling in general.”

Joe said that through education and awareness, the technique has continued to grow, making it ideal for many projects.

“The education side has improved and the more successful projects we do, the more trust they’re having in the system to get these projects done,” Joe said.

With depths varying between 10m to 12m, the Rankin Street job did prove to be challenging for the Pezzimenti team.

“It’s a high-risk job, not from a safety perspective but constructability wise, it’s pretty risky,” Joe said.

Pezzimenti Trenchless
Pezzimenti Trenchless has positioned itself at the forefront of the trenchless industry through its laser-guided microtunnelling system.

Specifically, groundwater was a challenge, with some of the ground’s strength testing at 220 megapascals (MPa), which is considered high-strength rock.

However, as the Pezzimenti Trenchless laser-guided method ensures all types of pipes are installed efficiently, the team was able to complete the works successfully despite the complications.

“We pride ourselves on our unparalleled experience and expertise in setting the standard for the industry when it comes to quality, care, and development,” Joe said.

“The dedication our team shows when it comes to completing a project, however big or small under any circumstance, in an efficient and effective manner, is why we’ve stood the test of time.”

Since 1957, Pezzimenti Trenchless has positioned itself at the forefront of the trenchless industry through its laser-guided microtunnelling system.

The company has worked on crucial projects across Victoria and built strong relationships with major construction groups, becoming valued partners in the process.

This article featured in the August edition of Trenchless Australasia. 

Subscribe to Trenchless Australasia for the latest project and industry news.

Tags: Pezzimenti Trenchless
5

$2,875

POA

(HIRE)

2014 DIGGA PD3

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
6

$1,650

POA

(HIRE)

2015 DIGGA CB01

  • » Listing Type: Used
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
4

$1,800

POA

(HIRE)

DIGGA CORE BARREL CB100

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
1

$1,690

TANNERTRACK - Hydraulic Post Hole Digger - Many auger sizes available

  • » Listing Type: New
Location marker The shape of a location marker

Pakenham, VIC

03 8547 8769
MORE DETAILS
18

$62,950

2011 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
19

$82,950

2018 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
13

$10,000

POA

(HIRE)

DIGGA PD50

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
Premium Ad
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sunshine West, VIC

03 9999 3372
MORE DETAILS
15

$28,000

1995 DITCH WITCH JT820

  • » Listing Type: Used
Location marker The shape of a location marker

Dalby, QLD

07 3171 1722
MORE DETAILS
1

$2,600

RED ROO NA

  • » Listing Type: Used
Location marker The shape of a location marker

Eltham, VIC

03 8373 7151
MORE DETAILS
5

$1,495

POWERTECH HONDA GX50 CORE DRILL

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS
5

$1,395

POWERTECH CORE DRILL STAND (ONLY) TO SUIT PCD-352

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS

Related Posts

Watermain installation at Lethbridge in Victoria.

Latest trenchless tenders drop for Yass, Bankstown, Manor Lakes, Laverton North

by Staff Writer
April 9, 2026

Trenchless Australasia has teamed up with Australian Tenders to bring readers the latest trenchless tenders.   North East Water Minor...

The Picote’s Flexi-Sliplining system being deployed.

First ever Picote Flexi-Sliplining installation made in Australasia

by Staff Writer
April 7, 2026

Plumbtrax Infrastructure Services has successfully completed the first installation of Picote Flexi-Sliplining technology. It marks a significant milestone for the...

A giant gantry lowers a TBM cutterhead into the launch box.

Giant cutterhead craned into place for T2D TBMs

by Staff Writer
April 2, 2026

The final piece of the road corridor that will link Adelaide’s north to the south is another step closer to...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Trenchless Australasia is the leading source of news and information in Australia and New Zealand. In addition to being the official publication of the Australasian Society for Trenchless Technology (ASTT) it is also the official media partner of the biggest specialist trenchless technology event in the Southern Hemisphere, No-Dig Down Under.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Us

  • Advertise
  • About
  • Contact
  • Subscribe
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • From the magazine
  • News
  • Featured
  • Utility location
  • Rehabilitation

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
  • Advertise
  • About
  • List Stock
  • Business Directory
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited