• About
  • Advertise
  • Contact
  • Subscribe
  • List Stock
  • Business Directory
Saturday, April 11, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
Home News

Adapting to a region’s growing water and wastewater needs

by Vivien Topalovic
June 25, 2024
in Australia, Featured, HDD, News, Victoria
Reading Time: 5 mins read
A A
Gippsland Water

For these pipeline works, Gippsland Water used numerous trenchless techniques, such as HDD. Image: Gippsland Water

Gippsland Water has completed two major projects to provide local communities with water security. Trenchless Australasia takes a look at the two projects helping increase water supply and improve sewer system capacity.

Securing water and ensuring sewer systems are optimal for the future is vital, and no one knows this quite like Gippsland Water.

The utility’s new pipeline is delivering more water to Drouin via the Moe-Warragul interconnect, creating a second source for the quickly expanding Victorian town.

Gippsland Water senior project delivery lead David Peake said this project had been crucial for the communities in the region.

“The Warragul western ring main is a large diameter transfer main that loops through a largely undeveloped area to the west and south of Warragul. The project has allowed for future development between the Warragul and Drouin townships,” he said.

“Hydraulic modelling has also shown that the addition of the Warragul western ring main balances the pressure and flow characteristics of the Warragul water supply system, which significantly decreases the reliance on pre-existing large diameter assets in the township.”

According to Peake, Warragul, Drouin, and surrounding towns have developed significantly in the last decade and the western ring main is part of Gippsland Water’s work to proactively manage the region’s growing water and wastewater needs.

Gippsland Water
Through two crucial projects, Gippsland has provided the Warragul communities with an increased water security. Image: Gippsland Water

The main was constructed using horizontal directional drilling (HDD) methods, which was selected to minimise the impact of the project on native flora and fauna, including the Warragul Burrowing Crayfish and Giant Gippsland Earthworm habitats.

“The main extends for about 4.3km and consists of a 0.7km of DN450 PVC-M PN16 pipe section which was constructed via open trenching. 3.1km of DN560 PE100 PN 16 pipe was installed using trenchless (HDD) methods and 0.5km of DN560 PE100 PN16 was also constructed via open trenching,” Peake said.

“The project was largely bored rather than open trenched to minimise the impacts to the natural environment.”

The new pipeline travels in a north-westerly direction through road reserves from Butlers Track to the railway crossing on Lardners Track.

Gippsland Water
Construction of the Warragul western ring main began in mid-2022 and was completed in mid-2023. Image: Gippsland Water
Gippsland Water
The western ring main is part of Gippsland Water’s work to proactively manage the region’s growing water and wastewater needs. Image: Gippsland Water
Gippsland Water
As local communities’ demographics are booming, these projects were needed for a continued water security. Image: Gippsland Water

It has also provided an alternative supply to the town of Warragul that can be used during maintenance or emergency work, avoiding interruptions to customers’ water supply.

According to Gippsland Water, Warragul and Drouin are two of the fastest growing towns in the region, and understand that building water and wastewater infrastructure is vital to keep ahead of the growth – and the Warragul western ring main project is an essential part of this work.

The pipeline will assist development in the south-west growth corridor of Warragul. It will also increase the volume and security of water supplies for Drouin.

The water main will be constructed around existing urban areas to provide an additional main to supply water to Drouin, with further extensions of the pipeline planned in the future, in line with local urban development.

Throughout the process, Gippsland Water has actively worked to protect environmental and cultural heritage values, with environmental assessments completed for the Giant Gippsland Earthworm, Warragul Burrowing Crayfish and Strzelecki Gums.

The utility is committed to protecting environmental and cultural heritage values as the project continues, as well as making sure the works cause minimal disruption to the local species by using underground boring and keeping the route along previously disturbed areas of road.

Gippsland Water is working with Traditional Owners to protect cultural heritage and any artefacts found.

Community consultation and engagement was also inherent to the project, as Gippsland Water engaged with residents and stakeholders while planning for this work, including consulting residents along the pipe route.

Gippsland Water has also started works to increase the Warragul’s north-east region’s sewer system capacity starting this year.

The project, for which a $7 million contract was awarded late last year, involves upgrading a 1.5km section of existing sewer main by installing a new larger pipeline

Gippsland Water managing director Sarah Cumming said the new sewer main was an important upgrade and would help prepare for Warragul’s future.

“We always look ahead and plan for the future to determine what services our customers will need and when,” she said.

The new pipeline will transfer all wastewater from homes and businesses in Warragul’s north-east future boundary to the town’s wastewater treatment plant.

Construction will begin within the boundaries of the Warragul wastewater treatment plant before progressing in a northerly direction towards Stoddarts Road.

“It’s essential for our network to be able to withstand pressures like population growth, rainfall variability and climate change,” Cumming said.

“The existing sewer main was built in 1971, when there were fewer homes and businesses in the area, but it is now nearing capacity.

“Upgrades like this one also benefit the environment by reducing the risk of spills and main failures.”

Construction will begin in the coming weeks, with traffic management in place on roads at various times during construction.

The project is on track to be completed in mid-2025.

This article featured in the June edition of Trenchless Australasia. 

Subscribe to Trenchless Australasia for the latest project and industry news.

Tags: Gippsland water
13

$10,000

POA

(HIRE)

DIGGA PD50

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
5

$2,875

POA

(HIRE)

2014 DIGGA PD3

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
4

$1,800

POA

(HIRE)

DIGGA CORE BARREL CB100

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
1

$1,690

TANNERTRACK - Hydraulic Post Hole Digger - Many auger sizes available

  • » Listing Type: New
Location marker The shape of a location marker

Pakenham, VIC

03 8547 8769
MORE DETAILS
18

$62,950

2011 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
19

$82,950

2018 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
6

$1,650

POA

(HIRE)

2015 DIGGA CB01

  • » Listing Type: Used
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
Premium Ad
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sunshine West, VIC

03 9999 3372
MORE DETAILS
21

$320,000

2006 ATLAS COPCO E2C

  • » Listing Type: Used
  • » Category: Carrier Mounted
Location marker The shape of a location marker

Dubbo, NSW

02 8315 0022
MORE DETAILS
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sydney, NSW

02 8999 7036
MORE DETAILS
6

$1,210,000

XCMG XR240E ROTARY PILING RIG

  • » Listing Type: New
Location marker The shape of a location marker

Brisbane City, QLD

07 3177 1695
MORE DETAILS
6

$2,395

POWERTECH CORE DRILL 352D

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS

Related Posts

Watermain installation at Lethbridge in Victoria.

Latest trenchless tenders drop for Yass, Bankstown, Manor Lakes, Laverton North

by Staff Writer
April 9, 2026

Trenchless Australasia has teamed up with Australian Tenders to bring readers the latest trenchless tenders.   North East Water Minor...

The Picote’s Flexi-Sliplining system being deployed.

First ever Picote Flexi-Sliplining installation made in Australasia

by Staff Writer
April 7, 2026

Plumbtrax Infrastructure Services has successfully completed the first installation of Picote Flexi-Sliplining technology. It marks a significant milestone for the...

A giant gantry lowers a TBM cutterhead into the launch box.

Giant cutterhead craned into place for T2D TBMs

by Staff Writer
April 2, 2026

The final piece of the road corridor that will link Adelaide’s north to the south is another step closer to...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Trenchless Australasia is the leading source of news and information in Australia and New Zealand. In addition to being the official publication of the Australasian Society for Trenchless Technology (ASTT) it is also the official media partner of the biggest specialist trenchless technology event in the Southern Hemisphere, No-Dig Down Under.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Us

  • Advertise
  • About
  • Contact
  • Subscribe
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • From the magazine
  • News
  • Featured
  • Utility location
  • Rehabilitation

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
  • Advertise
  • About
  • List Stock
  • Business Directory
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited