• About
  • Advertise
  • Contact
  • Subscribe
  • List Stock
  • Business Directory
Monday, April 13, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
Home

Boring the urban environment

by Staff Writer
April 20, 2010
in From the magazine, Microtunnelling, Tunnelling
Reading Time: 3 mins read
A A

The project is part of Jemena Asset Management’s ongoing upgrade of the high pressure natural gas system in Sydney and involves the construction of approximately 2,500 metres of 200 mm diameter secondary pressure steel main to provide capacity for growth and security of supply to Sydney’s eastern suburbs.

The X42 steel pipeline has a wall thickness of 6.4 mm and operates at a 1,050 kPa maximum allowable operating pressure.

Connection points for the pipeline include a 200 mm diameter connection on the southern side of Oxford Street and a 150 mm diameter connection at Marathon Road, Darling Point, between Marathon Lane and Adelaide Street.

The project differed from others in terms of the location of the works and the ground conditions in which the pipe was being installed. The pipeline route went from Centennial Park to Darling Point near Rushcutters Bay and was predominantly located within the road carriageway in residential and commercial areas. This route location – coupled with varying ground conditions of sandstone, ironstone rock and sand – posed challenges for the project.

Road crossings

The project involved two major road crossings – across Oxford Street and New South Head Road.

After investigation, it was decided that case boring would be the best method for the Oxford Street crossing and before the commencement of works, a detailed services search and location exercise was carried out at night to locate and identify all existing services in the path.

A bore hole was constructed over three days in Victoria Avenue for the approximately 55 metres crossing through solid sandstone rock.

The crossing at New South Head Road was required to be open cut due to the restricted space for a bore hole and the amount of existing services located within the area. These works were carried out overnight and required a total of four vertical alignment changes on the pipe to avoid the existing services.

Codmah purchased its first Vermeer trencher, the T800B, sixteen years ago, and now owns and operates the T800B rock trencher, a T755 rock trencher and three 24×40 horizontal directional drilling rigs.

Mr Saunders says “We have an ongoing relationship with Vermeer, with both sales and service, which we believe has benefited both parties.”

Route selection in an urban area

Codmah says that selecting a pipeline route with the least impact on community and traffic was challenging. However, the main challenge lay in the ongoing design of the pipeline to suit the quantity of existing services along the route.

“Existing utilities are always a challenge within built up areas and this was certainly no exception,” says Mr Saunders.

“High and medium pressure natural gas pipelines, water mains and services, sewer mains and connections, stormwater, communications and electricity – both above and below ground – were all present along the route.”

Mr Saunders explains that the number of crossings required was double to triple that of other projects in built up areas due to the average length of house frontage to the street being 4-5 metres wide. This meant that there were two to three connections every 5 metres.

Ground conditions

The ground conditions on the project were challenging, as rock encountered was mainly sandstone and ironstone, requiring large machinery in small residential streets to trench, break, rip and cut the rock for removal.

“We encountered a surprise on Mona Street when we encountered fine sand under the road pavement and down to the trench base This caused the trench to be continually widening out as the sand walls collapsed and threatened to undermine the roadway,” says Mr Saunders.

“Sheets of ply were used to drive into the trench sides and help minimise the subsidence to allow works to continue.”

A job well done

The Paddington pipeline project was varied and required different methods of pipeline installation to successfully construct in the urban environment.

4

$1,800

POA

(HIRE)

DIGGA CORE BARREL CB100

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
19

$82,950

2018 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
1

$1,690

TANNERTRACK - Hydraulic Post Hole Digger - Many auger sizes available

  • » Listing Type: New
Location marker The shape of a location marker

Pakenham, VIC

03 8547 8769
MORE DETAILS
5

$2,875

POA

(HIRE)

2014 DIGGA PD3

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
18

$62,950

2011 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
13

$10,000

POA

(HIRE)

DIGGA PD50

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
6

$1,650

POA

(HIRE)

2015 DIGGA CB01

  • » Listing Type: Used
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
Premium Ad
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sunshine West, VIC

03 9999 3372
MORE DETAILS
21

$320,000

2006 ATLAS COPCO E2C

  • » Listing Type: Used
  • » Category: Carrier Mounted
Location marker The shape of a location marker

Dubbo, NSW

02 8315 0022
MORE DETAILS
4

$5,000

VERMEER HAMMERHEAD

  • » Listing Type: Used
Location marker The shape of a location marker

Eltham, VIC

03 8373 7151
MORE DETAILS
6

$2,395

POWERTECH CORE DRILL 352D

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS
1

$2,600

RED ROO NA

  • » Listing Type: Used
Location marker The shape of a location marker

Eltham, VIC

03 8373 7151
MORE DETAILS

Related Posts

Image: LINX Port Services

Herrenknecht tunnel boring machines arrive in Western Port

by Staff Writer
April 1, 2026

LINX Port Services has supported the delivery of the latest tunnel boring machines for the Suburban Rail Loop. The eagerly...

Attendees at No-Dig Down Under inspect drill rigs.

No Missing No-Dig

by Staff Writer
March 26, 2026

International No-Dig Auckland provides an unparalleled opportunity to connect with the global trenchless technology industry. Hosted each year in a...

Edge Underground is comfortably working at 1830mm, with plans for future development.

Edge Underground’s diameter evolution

by Staff Writer
March 23, 2026

From the beginning, Stuart Harrison and the Edge Underground team built their reputation on being able to repeatably and accurately...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Trenchless Australasia is the leading source of news and information in Australia and New Zealand. In addition to being the official publication of the Australasian Society for Trenchless Technology (ASTT) it is also the official media partner of the biggest specialist trenchless technology event in the Southern Hemisphere, No-Dig Down Under.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Us

  • Advertise
  • About
  • Contact
  • Subscribe
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • From the magazine
  • News
  • Featured
  • Utility location
  • Rehabilitation

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
  • Advertise
  • About
  • List Stock
  • Business Directory
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited