Trelleborg offers a complete portfolio of solutions for the rehabilitation of drain and wastewater systems; starting from the sink in your bathroom and down to the wastewater treatment plant outside your city or municipality. Most efficient, eco-friendly technologies to service and maintain underground utilities in a less disruptive way than open trench working. Well-proven and tested. All that is needed is an access point, such as a manhole or pipe opening. Trelleborg’s trenchless “no-dig” sewer rehabilitation solutions cater to the rehabilitation of pipes ranging in a diameter from 30 - 1,600 mm. The pipes are not simply sealed, but create a pipe within the existing pipe with a cured joint of lining material and resin. This finished product forms a friction-fit and structurally sound connection with the existing pipe.
Maxibor is a leading horizontal directional drilling HDD specialist. It has the capability to design and construct all HDD solutions across the rail oil and gas water and sewer power road mining telecommunications and renewables market sectors.The company’s highly regarded and experienced team have developed their capabilities in the design and install of HDD and civil solutions for projects and programs of work spanning more than 25 years. No project is too complex for Maxibor. It’s engineering and design expertise has been involved in major long-distance and large diameter gas water cable landings and outfall installations in Australia and overseas.