• About
  • Advertise
  • Contact
  • Subscribe
  • List Stock
  • Business Directory
Sunday, April 12, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
Home

Coe crosses the Maroochy River with ease

by
November 25, 2013
in From the magazine, HDD
Reading Time: 2 mins read
A A

Early in 2013 Unitywater awarded a contract for the HDD crossing of the Maroochy River in Queensland to Coe Drilling. The crossing forms part of the Suncoast sewage treatment plant closure and transfer pumping station and rising main upgrade works.

The Maroochy River HDD crossing involved the construction of a sewer rising main under the Maroochy River. This forms part of the link between the Suncoast Treatment Plant (which is scheduled for closure in mid-2014) and the Finland Road Treatment Plant. Once completed sewerage will be pumped from the Suncoast Treatment Plant site via a new pump station and 6 km of rising main to the Finland Road site.

THE PROJECT

The project included the design, procurement and construction of 820 m of DN500 HDPE 100 sewage rising main.

Given the project location and the surrounding geology, a detailed design was required to satisfy the client’s specifications and alleviate concerns regarding the risk of hydrofracture in the Maroochy River.

The alignment chosen by Coe Drilling placed the crossing in the soft alluvial soils under the Maroochy River. By placing the crossing in this softer material Coe Drilling was able to deliver a cost-effective solution to meet the client’s requirements. The consequence of placing the crossing in this formation was an increase in the risk of hydrofracture. Coe Drilling was able to demonstrate that this risk could be managed by completing a detailed hydrofracture analysis of the theoretical profile.

HDD OPERATIONS

Drilling commenced early in August 2013 following finalisation and peer review of all design documentation.

Using Coe Drilling’s Prime PD500 drill rig, a pilot hole was drilled from the southern side of the Maroochy River, near the Maroochy Mulitsports Complex. Throughout this phase of construction, down hole pressures were continually monitored, using a down hole pressure probe, to ensure that no hydrofracture occurred.

The twelve-and-a-quarter inch pilot hole was successfully completed without incident in mid-August 2013.

Following the successful completion of the pilot hole two reaming passes and a hole conditioning pass were completed prior to pipe installation occurring.

The product pipe was fabricated using industry standard practises on the northern side of the river. Product pipe installation was successfully completed mid-September 2013.

5

$2,875

POA

(HIRE)

2014 DIGGA PD3

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
6

$1,650

POA

(HIRE)

2015 DIGGA CB01

  • » Listing Type: Used
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
4

$1,800

POA

(HIRE)

DIGGA CORE BARREL CB100

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
1

$1,690

TANNERTRACK - Hydraulic Post Hole Digger - Many auger sizes available

  • » Listing Type: New
Location marker The shape of a location marker

Pakenham, VIC

03 8547 8769
MORE DETAILS
18

$62,950

2011 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
19

$82,950

2018 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
13

$10,000

POA

(HIRE)

DIGGA PD50

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
Premium Ad
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sunshine West, VIC

03 9999 3372
MORE DETAILS
15

$28,000

1995 DITCH WITCH JT820

  • » Listing Type: Used
Location marker The shape of a location marker

Dalby, QLD

07 3171 1722
MORE DETAILS
1

$2,600

RED ROO NA

  • » Listing Type: Used
Location marker The shape of a location marker

Eltham, VIC

03 8373 7151
MORE DETAILS
5

$1,495

POWERTECH HONDA GX50 CORE DRILL

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS
5

$1,395

POWERTECH CORE DRILL STAND (ONLY) TO SUIT PCD-352

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS

Related Posts

The completed bore arrived on the exact grade and alignment required to connect seamlessly into the existing manhole.

S&Z Australia masters rocky terrain with HDD in Bendigo

by Staff Writer
April 2, 2026

S&Z Australia recently completed tricky horizontal directional drilling (HDD) works in difficult conditions in Bendigo. Engaged by Leech Earthmoving Contracting...

Crews prepare the pipeline installation for Bribie Island.

Unitywater adopts trenchless techniques for Bribie Island pipeline upgrades

by Staff Writer
April 2, 2026

Horizontal Directional Drilling (HDD) and auger boring will be used for the water main upgrade on Bribie Island Road, Caboolture,...

Attendees at No-Dig Down Under inspect drill rigs.

No Missing No-Dig

by Staff Writer
March 26, 2026

International No-Dig Auckland provides an unparalleled opportunity to connect with the global trenchless technology industry. Hosted each year in a...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Trenchless Australasia is the leading source of news and information in Australia and New Zealand. In addition to being the official publication of the Australasian Society for Trenchless Technology (ASTT) it is also the official media partner of the biggest specialist trenchless technology event in the Southern Hemisphere, No-Dig Down Under.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Us

  • Advertise
  • About
  • Contact
  • Subscribe
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • From the magazine
  • News
  • Featured
  • Utility location
  • Rehabilitation

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
  • Advertise
  • About
  • List Stock
  • Business Directory
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited