• About
  • Advertise
  • Contact
  • Subscribe
  • List Stock
  • Business Directory
Sunday, April 12, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
Home

Condition monitoring for management and operation of urban water systems

by Staff Writer
July 28, 2009
in From the magazine
Reading Time: 3 mins read
A A

Condition assessment is required to provide input into pipe lifetime models and is essential for critical mains when no failure history is available. Models currently being developed, such as the PARMS software suite focuses on providing optimised renewal strategies for buried assets, allowing limited condition monitoring to be utilised to predict the condition of critical networks. Although pipelines are designed for a particular lifespan under standard operating conditions, their deterioration never follows a set pattern. Environmental interactions (soil chemicals, ground movement) plus exposure to water quality variations and operating abnormalities ensure that pipeline deterioration is never uniform. Eventually, through a combination of internal and external stresses, the pipe fails. Sometimes this process is accelerated when defence measures such as protective coatings are damaged or not repaired properly. The challenge for condition monitoring is to provide information on the pipe and its environment to estimate, as accurately as possible, its time to failure or probability of failure.

Structural failure of pipelines is principally due to:

“¢ Deterioration of pipe wall strength

“¢ Changes in the external stresses

“¢ Effects of internal stresses (from water pressure, water hammer, etc.)

The techniques available for condition assessment fall into two categories – direct and indirect. The direct techniques are based on the physical properties of the pipe wall. Electromagnetic, ultrasonic, radiographic and acoustic techniques are examples of direct techniques, and were first developed for the oil and gas industry. Geochemical and geophysical techniques are considered indirect techniques as condition information is inferred through measurement of a surrogate property, such as the electrochemical properties of surrounding soil. While high-resolution direct techniques are potentially capable of identifying and dimensioning pits, indirect techniques can provide, at best, estimates of the average corrosion rate that a pipe has been subjected to over its lifetime.

Condition assessment techniques that can be applied to pipes in situ are the most attractive. While there are only a limited number that can be applied in situ, they have been developed primarily for the oil and gas industry and are designed to assess long lengths of pipes without sharp bends and T junctions. These tools are launched through special access ports and propelled through the pipeline by product pressure. Therefore, while some of these tools are unsuitable, others have been successfully adapted for water pipelines.

The team is working with research groups and industry to establish the data requirements needed by the water industry to aid in efficient asset management strategies and increase the lifetime of buried assets. This data definition is based on whole life costing strategies and includes information on asset lifetimes, customer preferences and externalities. The major science lies in establishing processes for determining much of this information and developing integrated systems for its use in advanced Asset Management systems. This data has been applied in the creation of the PARMS series of software, which has been developed to aid the planning, prioritisation and risk management of urban water infrastructure. This software has already identified major savings in the expenditure of water authorities on their infrastructure. This has enabled water authorities to establish more sophisticated management strategies to maximise the lifetime of their assets whilst minimising expenditure.

The PARMS software suite consists of 3 software tools, PARMS Planning, PARMS Priority and PARMS Risk.

PARMS Planning is a software package that allows whole life costing analysis of buried water reticulation assets for water authorities. The programme incorporates customer preference, the cost externalities and allows different management operational strategies to be analysed. This model has so far been sold to four Australian water authorities.

PARMS Priority is an extension of PARMS Planning focussing on providing optimised renewal strategies for buried assets.

PARMS Risk is the final stage of the PARMS suite and trades off probability and consequence of failure for critical assets. Since these assets have generated little or no historical failure data, the use of cost-effective condition assessment is essential to estimate failure probability.

5

$2,875

POA

(HIRE)

2014 DIGGA PD3

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
6

$1,650

POA

(HIRE)

2015 DIGGA CB01

  • » Listing Type: Used
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
4

$1,800

POA

(HIRE)

DIGGA CORE BARREL CB100

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
1

$1,690

TANNERTRACK - Hydraulic Post Hole Digger - Many auger sizes available

  • » Listing Type: New
Location marker The shape of a location marker

Pakenham, VIC

03 8547 8769
MORE DETAILS
18

$62,950

2011 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
19

$82,950

2018 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
13

$10,000

POA

(HIRE)

DIGGA PD50

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
Premium Ad
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sunshine West, VIC

03 9999 3372
MORE DETAILS
15

$28,000

1995 DITCH WITCH JT820

  • » Listing Type: Used
Location marker The shape of a location marker

Dalby, QLD

07 3171 1722
MORE DETAILS
1

$2,600

RED ROO NA

  • » Listing Type: Used
Location marker The shape of a location marker

Eltham, VIC

03 8373 7151
MORE DETAILS
5

$1,495

POWERTECH HONDA GX50 CORE DRILL

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS
5

$1,395

POWERTECH CORE DRILL STAND (ONLY) TO SUIT PCD-352

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS

Related Posts

Attendees at No-Dig Down Under inspect drill rigs.

No Missing No-Dig

by Staff Writer
March 26, 2026

International No-Dig Auckland provides an unparalleled opportunity to connect with the global trenchless technology industry. Hosted each year in a...

Edge Underground is comfortably working at 1830mm, with plans for future development.

Edge Underground’s diameter evolution

by Staff Writer
March 23, 2026

From the beginning, Stuart Harrison and the Edge Underground team built their reputation on being able to repeatably and accurately...

The RCX100 camerahead is a 1080p high definition pan-tilt zoom camera.

Inspection and profiling, simplified

by Staff Writer
March 20, 2026

For decades, pipeline inspection has followed a familiar rhythm: complete a visual CCTV inspection, pack up, then return with separate...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Trenchless Australasia is the leading source of news and information in Australia and New Zealand. In addition to being the official publication of the Australasian Society for Trenchless Technology (ASTT) it is also the official media partner of the biggest specialist trenchless technology event in the Southern Hemisphere, No-Dig Down Under.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Us

  • Advertise
  • About
  • Contact
  • Subscribe
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • From the magazine
  • News
  • Featured
  • Utility location
  • Rehabilitation

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
  • Advertise
  • About
  • List Stock
  • Business Directory
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited