• About
  • Advertise
  • Contact
  • Subscribe
  • List Stock
  • Business Directory
Saturday, April 11, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
Home

Drilling across the nation

by Staff Writer
September 23, 2011
in From the magazine, HDD
Reading Time: 4 mins read
A A

Codmah initially began operating in Sydney and across New South Wales, and has since expanded to undertake private and government-funded projects in the ACT, Queensland, the Northern Territory, Victoria and Tasmania.

The company has a range of HDD equipment which can cater for small tight access bores, mid-sized bores, and large diameter rock bores. Their fleet includes Vermeer 24×40, 36×50 and D100x120 drilling machines. All rigs include their own vacuum sucker truck and recycling units as required.

The case boring division of the company currently has six rigs which can install steel or concrete jacking pipes in sizes ranging from 300 to 1,350 mm in diameter; and the company also has two pipe jacking rigs that can install larger diameter pipes starting from 1,500 mm.

Penrith to Emu Plains primary gas main


Codmah is currently undertaking an HDD project which involves a crossing under the Nepean River and an under-rail bore crossing at Emu Plains. The rail crossing is under the main Western rail line, and involves approximately 70 m of thrust boring and pipe jacking to install a 375 mm reinforced concrete jacking pipe to accommodate the 200 mm steel gas main.

The HDD installation of the pipeline across the Nepean River from Penrith to Emu Plains involves the installation of approximately 583 m of 200 mm steel primary mains under the Great Western Highway at two locations. Codmah is planning to use their Vermeer D100 x120 HDD rig for the bore.

The geotechnical report for the bore shows that there is a significant layer of cobblestones on both sides of the bore. The cobblestone layer makes the bore difficult for the following reasons:

  • Construction – the cobbles and the surrounding ground will be very unstable and will continually collapse on the drill rods, head or reamer. This will make trying to maintain the integrity of the hole impossible regardless of the drilling fluids that are used. It is highly unlikely that a pipe could be pulled back through these ground conditions.
  • Environmental – the cobbles and the surrounding ground will make the retention and return of drilling fluids almost impossible. There is a high likelihood that there will be a loss of drilling fluids through these permeable ground conditions which could result in frac outs.

To address these issues, Codmah has decided to install a 600 mm steel case pipe by case boring on both the entry and exit points of the bore. The steel casing is to be installed through the initial layer of silty clay/sand, and then through the layer of gravel/cobbles. It will stop when it strikes the laminate (sandstone) layer, as per the geotechnical report.

Using this method will fix the HDD entry and exit point, leaving a very narrow window and reducing the chances of actually hitting the exit casing pipe. In order to overcome this problem, Codmah are now looking at using two HDD rigs. The Paratrack Guidance System will drill a pilot hole to a planned intersection point midway, and the second rig will drill an intersection hole from the exit point.

After intersection of the pilot shot is achieved and a complete drill string is established from entry to exit, normal reaming operations will commence and the 200 mm gas pipeline line will be installed.

Wakehurst Parkway


The recently completed Wakehurst Parkway job involved the decommissioning of an existing 375 mm medium pressure steel pipeline, and construction of a new 250 mm diameter polyethylene (PE) gas main, into an 11 km section of the existing steel gas main between Frenchs Forest Road and North Narrabeen. This was to boost the secondary gas system in the Northern Beaches area of Sydney.

The innovative method used was to pull the new PE pipe through the existing gas pipe. The upgrade required the pipe to withstand operating pressures of 1,050 kPa.

An approximately 158 m string of welded pipe was installed by HDD, allowing the rods to be inserted through the pipe section – a proven method for attaching and pulling back PE pipe.

Codmah used their Vermeer D100x120A HDD rig as the primary piece of machinery, together with Vermeer 24x40A rigs.

Codmah carried out all traffic control on this project, which involved extensive night works leading to the partial closure of a two lane major RTA road.

13

$10,000

POA

(HIRE)

DIGGA PD50

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
5

$2,875

POA

(HIRE)

2014 DIGGA PD3

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
4

$1,800

POA

(HIRE)

DIGGA CORE BARREL CB100

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
1

$1,690

TANNERTRACK - Hydraulic Post Hole Digger - Many auger sizes available

  • » Listing Type: New
Location marker The shape of a location marker

Pakenham, VIC

03 8547 8769
MORE DETAILS
18

$62,950

2011 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
19

$82,950

2018 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
6

$1,650

POA

(HIRE)

2015 DIGGA CB01

  • » Listing Type: Used
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
Premium Ad
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sunshine West, VIC

03 9999 3372
MORE DETAILS
21

$320,000

2006 ATLAS COPCO E2C

  • » Listing Type: Used
  • » Category: Carrier Mounted
Location marker The shape of a location marker

Dubbo, NSW

02 8315 0022
MORE DETAILS
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sydney, NSW

02 8999 7036
MORE DETAILS
6

$1,210,000

XCMG XR240E ROTARY PILING RIG

  • » Listing Type: New
Location marker The shape of a location marker

Brisbane City, QLD

07 3177 1695
MORE DETAILS
6

$2,395

POWERTECH CORE DRILL 352D

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS

Related Posts

The completed bore arrived on the exact grade and alignment required to connect seamlessly into the existing manhole.

S&Z Australia masters rocky terrain with HDD in Bendigo

by Staff Writer
April 2, 2026

S&Z Australia recently completed tricky horizontal directional drilling (HDD) works in difficult conditions in Bendigo. Engaged by Leech Earthmoving Contracting...

Crews prepare the pipeline installation for Bribie Island.

Unitywater adopts trenchless techniques for Bribie Island pipeline upgrades

by Staff Writer
April 2, 2026

Horizontal Directional Drilling (HDD) and auger boring will be used for the water main upgrade on Bribie Island Road, Caboolture,...

Attendees at No-Dig Down Under inspect drill rigs.

No Missing No-Dig

by Staff Writer
March 26, 2026

International No-Dig Auckland provides an unparalleled opportunity to connect with the global trenchless technology industry. Hosted each year in a...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Trenchless Australasia is the leading source of news and information in Australia and New Zealand. In addition to being the official publication of the Australasian Society for Trenchless Technology (ASTT) it is also the official media partner of the biggest specialist trenchless technology event in the Southern Hemisphere, No-Dig Down Under.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Us

  • Advertise
  • About
  • Contact
  • Subscribe
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • From the magazine
  • News
  • Featured
  • Utility location
  • Rehabilitation

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
  • Advertise
  • About
  • List Stock
  • Business Directory
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited