• About
  • Advertise
  • Contact
  • Subscribe
  • List Stock
  • Business Directory
Monday, April 13, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
Home

Frankston Drainage Improvement Project

by Staff Writer
April 19, 2010
in From the magazine
Reading Time: 3 mins read
A A

The Frankston Drainage Improvement Project involves the construction of a 1.5 kilometre stormwater drainage pipeline from Monash University Peninsula Campus car park to Kananook Creek.

The project is being constructed by the Pipelines Alliance, a joint venture between Fulton Hogan, Jaydo, GHD and Melbourne Water. The tunnelling works of the project have been contracted to Winslow Infrastructure.

The Frankston Drainage Improvement Project began construction in September 2009 and saw the construction of a twelve metre deep shaft at Monash University Peninsula Campus.

Sandy tunnels under Frankston

Under the operation of Winslow Infrastructure, Sandy the tunnel boring machine (TBM) is currently excavating a 3 metre outer diameter tunnel to house the new 2.5 metre diameter concrete stormwater pipeline.

At present, Sandy has tunnelled 50 metres into the first tunnel drive. Precast DN2,500 jacking pipes are installed behind the TBM and will form the final lining for the stormwater drain.

“Sandy has now crossed under McMahons Road without impacting on this busy thoroughfare,” said Project Director Phil Corluka.

“The route now follows the rail corridor alongside Hastings Road and close consultation with local asset owners will help ensure works do not adversely affect existing service providers,” he said.

Geology comprising of predominantly stiff clays has dictated the requirement for extensive separation equipment during the tunnelling process, and most notably the addition of clarifiers and belt presses to remove the fine particles from the slurry solution.

While the separation process has increased the set-up and commissioning requirements prior to tunnelling, it ensures that a generally dry product can be removed from site. Expected higher percentages of sand and gravels further into the drive will assist the separation process.

The remaining of the four shafts have now been completed in advance of the second and third tunnel drives. Shafts are constructed using either secant or contiguous bored piles dependant on existing ground conditions.

The tunnelling section of the project is expected to be completed by May 2010 with the project being fully commissioned in early 2011.

Next in the pipeline

Melbourne Water has announced another $A7 million project that involves replacing 60 metres of the Riviera outlet pipeline. This new project will contribute to helping protect Frankston from flooding and complement the Frankston Drainage Improvement Project.

Sandy the TBM was christened by the Pipelines Alliance at an official ceremony in December 2009. The $A5 million mts PERFORATOR is a slurry TBM with earth pressure balance capabilities and was named Sandy by a local Frankston Primary School student due to the sandy clay it will bore through. Depending on the ground conditions, Sandy is expected to progress at a rate of ten metres per shift and will require eight tunnellers per shift to operate.

4

$1,800

POA

(HIRE)

DIGGA CORE BARREL CB100

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
19

$82,950

2018 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
1

$1,690

TANNERTRACK - Hydraulic Post Hole Digger - Many auger sizes available

  • » Listing Type: New
Location marker The shape of a location marker

Pakenham, VIC

03 8547 8769
MORE DETAILS
5

$2,875

POA

(HIRE)

2014 DIGGA PD3

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
18

$62,950

2011 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
13

$10,000

POA

(HIRE)

DIGGA PD50

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
6

$1,650

POA

(HIRE)

2015 DIGGA CB01

  • » Listing Type: Used
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
Premium Ad
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sunshine West, VIC

03 9999 3372
MORE DETAILS
21

$320,000

2006 ATLAS COPCO E2C

  • » Listing Type: Used
  • » Category: Carrier Mounted
Location marker The shape of a location marker

Dubbo, NSW

02 8315 0022
MORE DETAILS
4

$5,000

VERMEER HAMMERHEAD

  • » Listing Type: Used
Location marker The shape of a location marker

Eltham, VIC

03 8373 7151
MORE DETAILS
6

$2,395

POWERTECH CORE DRILL 352D

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS
1

$2,600

RED ROO NA

  • » Listing Type: Used
Location marker The shape of a location marker

Eltham, VIC

03 8373 7151
MORE DETAILS

Related Posts

Attendees at No-Dig Down Under inspect drill rigs.

No Missing No-Dig

by Staff Writer
March 26, 2026

International No-Dig Auckland provides an unparalleled opportunity to connect with the global trenchless technology industry. Hosted each year in a...

Edge Underground is comfortably working at 1830mm, with plans for future development.

Edge Underground’s diameter evolution

by Staff Writer
March 23, 2026

From the beginning, Stuart Harrison and the Edge Underground team built their reputation on being able to repeatably and accurately...

The RCX100 camerahead is a 1080p high definition pan-tilt zoom camera.

Inspection and profiling, simplified

by Staff Writer
March 20, 2026

For decades, pipeline inspection has followed a familiar rhythm: complete a visual CCTV inspection, pack up, then return with separate...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Trenchless Australasia is the leading source of news and information in Australia and New Zealand. In addition to being the official publication of the Australasian Society for Trenchless Technology (ASTT) it is also the official media partner of the biggest specialist trenchless technology event in the Southern Hemisphere, No-Dig Down Under.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Us

  • Advertise
  • About
  • Contact
  • Subscribe
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • From the magazine
  • News
  • Featured
  • Utility location
  • Rehabilitation

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
  • Advertise
  • About
  • List Stock
  • Business Directory
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited