• About
  • Advertise
  • Contact
  • Subscribe
  • List Stock
  • Business Directory
Sunday, April 12, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
Home

Future-proofing quake-prone assets

by
December 10, 2014
in From the magazine, Microtunnelling, Pipe jacking, Tunnelling
Reading Time: 5 mins read
A A

Not all of the damage done to Christchurch, New Zealand, by a string of bad earthquakes since 2010, is visible from the surface. A large portion of any city’s infrastructure lies underground, and has either been destroyed or damaged from the earthquakes. This damage includes most waste water systems in the city and the surrounding foothills.

In instances where sewer pipes completely failed, emergency measures during the natural disasters included temporary pumping, haulage or diversion until either the lines were restored or individual septic systems or collection tanks could be installed. Years after the earthquakes, there are still hundreds of miles of gravity-fed, clay-pipe sewer laterals requiring rehabilitation or replacement.

A trenchless solution

The Stronger Christchurch Infrastructure Rebuild Team (SCIRT) was created to oversee the reconstruction of Christchurch. SCIRT is a consortium of government agencies, known as “÷owner participants’ and of non-owner engineering, construction and maintenance providers.

One of the SCIRT’s fundamental tasks was to investigate and select techniques and materials that would not only repair infrastructure, but would also be able to stand the test of time and survive
future earthquakes.

In many places, trenching out the old lines was not an option. The durable, long-lasting materials SCIRT has chosen for replacing affected sewage laterals included polyvinylchloride (PVC) or polyethylene (PE) pipe.

These materials could be installed without the use of open-trenching through pipe bursting replacement technique.

Pipe bursting has proven to be not only one of the quickest trenchless installation techniques but one of the least intrusive to surrounding landscape and properties, as well as bearing a lower cost than other methods.

General Manager of Ditch Witch New Zealand John Grant said about 30 HammerHeadå¨ PortaBurstå¨ units were currently being used for pipe bursting projects in New Zealand.

PortaBurst units are 30-tonne pipe bursting systems used for replacing 50-150 mm lateral pipes.

As its name implies, the units are compact. Their modular design for easy disassembly, assembly and transport gives them even greater portability. Yet, the compact units have the power to easily fracture, press aside and pull 50-100 mm diameter PVC pipe through 45 m runs of existing vitrified clay pipe at rates of up to 3.7 m per min – without requiring excavation of the old pipe.

“In a lot of cases our contractors can’t use traditional excavating machinery to get to the pipe.

“They have to hand dig or use hydro-excavators, and they have to avoid disruptions to other services using the same trench,” Mr Grant said.

Mr Grant added that while initially his clients were just using the PortaBurst product for replacing pipe infrastructure underneath footpaths, driveways and around other utilities, they began selecting it for jobs that didn’t even require a trenchless method.

Pipe bursting became their first choice,” he said.

No longer a pipe dream

The feature of the pipe bursting system that struck Mr Grant first was how straightforward it was.

“Training does not take much time, it’s mostly done right on a job, learning how to dig the pits and shore them up properly, threading cable and doing the pulls,” he said.

For some of Ditch Witch’s customers who had never engaged with trenchless techniques during pipe rehabilitation works before, the uptake was easier than expected, Mr Grant said.

“At first the pull is done slower than in typical production, but customers catch on fast and are able to work on their own after that,” he said.

Mr Grant said he had one customer who reported he was astounded by what the product allowed him to do.

“Just doing crazy things, pulling around beams and retaining walls, he had heard that the PortaBurst could be used to make 45 degree bends, but he couldn’t believe it until he actually did it,” he said.

Typical runs on a Christchurch pipe burst are about 25 m, though under-road laterals may be 10-20 m long. They are almost all completed within a standard working shift.

Straight-forward bursting process

During a pipe replacement the PortaBurst contractor digs a pit on each end of a planned run down to the existing pipe. Much of the work is in pre-worked ground with silty sand matter, so pits are hydrovacced. The hydrovaccing makes a neater hole and is easier to restore.

SCIRT selects the replacement pipe options that contractors can choose from, some contractors have used threaded PVC, whilst others prefer to work with single lengths cut from reel stock or with fused lengths of straight pipe.

As the burst head progresses through the existing pipe, it fragments it, pushing the pieces aside whilst pulling the replacement in behind it. When it exits the other side, the contractor removes the head, documents his replacement work with CCTV, trims the pipe and reconnects it.

Ground conditions will return to normal around the pipe, with very little evidence of disruption.

THE LONG ROAD AHEAD

There is a tedious process residents go through to get approval for a sewer line replacement, insurance companies first have to approve the scope of repairs and the technique that will be used to fix them. Contractors are sometimes held up, waiting to start a job until the work is approved.

But there’s no end in sight for the work yet to be done. There may be anywhere from five to ten years of work to be undertaken. Not much work has been done in the foothills around Christchurch yet. There is ground seepage, and subsidence. And the earthquakes haven’t stopped.

Several years after the 7.1 magnitude earthquake in September 2010 and the deadly 6.3 quake in February 2011, the residents of Christchurch still live with consistent earthquakes yearly. More are inevitable due to New Zealand being located on the infamous “÷Ring of Fire’.

Nicknamed the “÷Shaky Isles’, New Zealand has consequently become advanced in post-earthquake rehabilitation techniques. Now, pipe bursting with the HammerHead PortaBurst system is one of them.

5

$2,875

POA

(HIRE)

2014 DIGGA PD3

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
6

$1,650

POA

(HIRE)

2015 DIGGA CB01

  • » Listing Type: Used
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
4

$1,800

POA

(HIRE)

DIGGA CORE BARREL CB100

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
1

$1,690

TANNERTRACK - Hydraulic Post Hole Digger - Many auger sizes available

  • » Listing Type: New
Location marker The shape of a location marker

Pakenham, VIC

03 8547 8769
MORE DETAILS
18

$62,950

2011 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
19

$82,950

2018 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
13

$10,000

POA

(HIRE)

DIGGA PD50

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
Premium Ad
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sunshine West, VIC

03 9999 3372
MORE DETAILS
15

$28,000

1995 DITCH WITCH JT820

  • » Listing Type: Used
Location marker The shape of a location marker

Dalby, QLD

07 3171 1722
MORE DETAILS
1

$2,600

RED ROO NA

  • » Listing Type: Used
Location marker The shape of a location marker

Eltham, VIC

03 8373 7151
MORE DETAILS
5

$1,495

POWERTECH HONDA GX50 CORE DRILL

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS
5

$1,395

POWERTECH CORE DRILL STAND (ONLY) TO SUIT PCD-352

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS

Related Posts

Concrete pipes for the Morgan to Whyalla Pipeline.

Major milestone reached on $61M pipeline upgrade

by Staff Writer
April 2, 2026

SA Water has reached a significant milestone in a $61.8 million upgrade to South Australia’s longest pipeline. Crews are currently...

Image: LINX Port Services

Herrenknecht tunnel boring machines arrive in Western Port

by Staff Writer
April 1, 2026

LINX Port Services has supported the delivery of the latest tunnel boring machines for the Suburban Rail Loop. The eagerly...

Attendees at No-Dig Down Under inspect drill rigs.

No Missing No-Dig

by Staff Writer
March 26, 2026

International No-Dig Auckland provides an unparalleled opportunity to connect with the global trenchless technology industry. Hosted each year in a...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Trenchless Australasia is the leading source of news and information in Australia and New Zealand. In addition to being the official publication of the Australasian Society for Trenchless Technology (ASTT) it is also the official media partner of the biggest specialist trenchless technology event in the Southern Hemisphere, No-Dig Down Under.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Us

  • Advertise
  • About
  • Contact
  • Subscribe
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • From the magazine
  • News
  • Featured
  • Utility location
  • Rehabilitation

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
  • Advertise
  • About
  • List Stock
  • Business Directory
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited