• About
  • Advertise
  • Contact
  • Subscribe
  • List Stock
  • Business Directory
Sunday, April 12, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
Home

HDD record set on Mardi-Mangrove Link Project

by Staff Writer
September 23, 2011
in From the magazine, HDD
Reading Time: 4 mins read
A A

This bore was for the Wyong creek crossing that formed part of the Mardi to Mangrove Link Project undertaken by John Holland for Gosford City Council and Wyong Shire Council. The project secured $A80.3 million in federal government funding from the Water Smart Australia program, and $A40 million in funding was provided by the councils themselves.

The project called for a 2.1 km buried water pipeline from the Wyong River to Mardi Dam, a 19 km buried pipeline through the Yarramalong Valley from Mardi Dam to the existing Bunning Creek Tunnel, two new pumping stations, and associated works. UEA subcontracted to John Holland for the horizontal directional drilling (HDD) works.

The creek crossing was originally planned as a microtunnelling project but ground conditions and the 10 m depth of the required shafts led John Holland to look at alternatives. Due to the Federally Protected Riparian Zone and platypus habitats, a pipe bridge was not possible in this location. Because 1,200 mm PE water main was not available in Australia and had not previously been installed by HDD, it was not originally considered. However, UEA found a pipe source in Austria and calculated that its Vermeer D300x500 directional borer was capable of installing this pipe in the prevailing ground conditions. A 1,524 mm diameter hole was required for installing the pipe, which was close to the limits of the HDD rig.

Apart from the difficult ground conditions (alluvial clay, sand, gravel and sandstone), further challenges included several flood events during the project; and the difficult site access, with a narrow 10 m wide construction corridor over 1.2 km providing access to the exit point.

A pair of 180 mm pipelines were used to return bore material from the entry to the exit site. A Morooka tracked transporter and 4×4 Barford site dumpers and 6×6 Moxy dumpers were used for accessing the site, as well as excavators in the 20-40 tonne operating weight class due to poor access and site restrictions.

The pipe was shipped to Australia in 11.8 m lengths, packed in 8×40 foot containers. The containers were decanted in Sydney, transported to site by semi-trailer and stockpiled there for later welding. KenKar was responsible for the butt fusion welding of the pipe, as well as the supply and fitting of 81 mm steel test plates to the end of the pipe string for pre-installation hydrostatic pressure testing. Upon completion of the welding, the pipe string was pressure tested to 1,600 kPa to prove
the integrity of the welding process. The pipe string was pressure tested again after installation into the HDD bore.

The butt fusion welding was carried out in accordance with European Standards as per the recommendations of the pipe manufacturer, as the local welding standard did not cover pipes of this wall thickness.

Drilling works commenced from the high side of the bore, as this area had the best access and allowed pipe to be strung out on the exit side during reaming operations. Reaming of the borehole was planned to step up in increments suited to the Vermeer and the prevailing geology with a final cut of 60″ planned. At completion of the pilot bore, a forward reaming pass was completed to allow the drill pipe to be pushed out for use as a tail string followed by back reaming stages. Difficulty was experienced half way through the 54″ pass after significant groundwater infiltration, gravel and cobble ground conditions were encountered. A second drill rig was utilised to seesaw the drill string to successfully complete the remaining reaming and swabbing passes prior to pipe pull. Upon successful conditioning
of the borehole, the drill string and pulling assembly was attached to the pipe ready for pullback. In order to meet the client’s exacting requirements, the pipe was filled with water during pullback from the already installed and tested main, enabling accurate buoyancy control
with fresh water.

UEA worked closely with drilling fluid supplier Baroid in choosing and monitoring the bentonite-based fluids used for the bore. A centrifuge of a size normally used in downhole oil well drilling was utilised to extract the bore cuttings, allowing 100 per cent of recovered material to be beneficially re-used on site rather than being transported from site for disposal. Given the difficult access, this provided a significant environmental and cost benefit.

Highside Drilling Services supplied both bore tracking services and assisted in calculations for the bore. Wire line steering tool technology was used to ensure that the bend radius for the pipe remained within manufacturer tolerances and that the pipe was installed within the narrow pipeline easement.

Despite the many challenges, UEA completed the bore successfully in early June 2011. The milestone in installing 1,200 mm SDR11 PN16 HDPE pipe via HDD has led to inquiries from other water authorities, and is causing a rethink in the industry about what can be achieved with HDD methods, which provide significant environmental benefits from reduced ground disturbance.

5

$2,875

POA

(HIRE)

2014 DIGGA PD3

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
6

$1,650

POA

(HIRE)

2015 DIGGA CB01

  • » Listing Type: Used
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
4

$1,800

POA

(HIRE)

DIGGA CORE BARREL CB100

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
1

$1,690

TANNERTRACK - Hydraulic Post Hole Digger - Many auger sizes available

  • » Listing Type: New
Location marker The shape of a location marker

Pakenham, VIC

03 8547 8769
MORE DETAILS
18

$62,950

2011 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
19

$82,950

2018 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
13

$10,000

POA

(HIRE)

DIGGA PD50

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
Premium Ad
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sunshine West, VIC

03 9999 3372
MORE DETAILS
15

$28,000

1995 DITCH WITCH JT820

  • » Listing Type: Used
Location marker The shape of a location marker

Dalby, QLD

07 3171 1722
MORE DETAILS
1

$2,600

RED ROO NA

  • » Listing Type: Used
Location marker The shape of a location marker

Eltham, VIC

03 8373 7151
MORE DETAILS
5

$1,495

POWERTECH HONDA GX50 CORE DRILL

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS
5

$1,395

POWERTECH CORE DRILL STAND (ONLY) TO SUIT PCD-352

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS

Related Posts

The completed bore arrived on the exact grade and alignment required to connect seamlessly into the existing manhole.

S&Z Australia masters rocky terrain with HDD in Bendigo

by Staff Writer
April 2, 2026

S&Z Australia recently completed tricky horizontal directional drilling (HDD) works in difficult conditions in Bendigo. Engaged by Leech Earthmoving Contracting...

Crews prepare the pipeline installation for Bribie Island.

Unitywater adopts trenchless techniques for Bribie Island pipeline upgrades

by Staff Writer
April 2, 2026

Horizontal Directional Drilling (HDD) and auger boring will be used for the water main upgrade on Bribie Island Road, Caboolture,...

Attendees at No-Dig Down Under inspect drill rigs.

No Missing No-Dig

by Staff Writer
March 26, 2026

International No-Dig Auckland provides an unparalleled opportunity to connect with the global trenchless technology industry. Hosted each year in a...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Trenchless Australasia is the leading source of news and information in Australia and New Zealand. In addition to being the official publication of the Australasian Society for Trenchless Technology (ASTT) it is also the official media partner of the biggest specialist trenchless technology event in the Southern Hemisphere, No-Dig Down Under.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Us

  • Advertise
  • About
  • Contact
  • Subscribe
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • From the magazine
  • News
  • Featured
  • Utility location
  • Rehabilitation

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
  • Advertise
  • About
  • List Stock
  • Business Directory
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited