• About
  • Advertise
  • Contact
  • Subscribe
  • List Stock
  • Business Directory
Friday, July 10, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
Home News

Patyegarang embarks on final phase of tunnelling under Sydney Harbour

by Staff Writer
June 30, 2026
in ACCIONA, New South Wales, News, Tunnel boring machines, Tunnelling, Western Harbour Tunnel
Reading Time: 2 mins read
A A
ACCIONA crew emerges from underground in Sydney.

Image: ACCIONA

The first of two tunnel boring machines (TBM) has commenced its final journey beneath Sydney Harbour in a major milestone for large scale project coordinator ACCIONA.

Built to handle some of the most complex geological conditions, these mega boring machines are equipped with state-of-the-art technology to deliver a significant piece of infrastructure for Sydney: the Western Harbour Tunnel.

TBM Patyegarang and sister TBM Barangaroo are the largest tunnel boring machines in the southern hemisphere, with Patyegarang this week having begun carving her way beneath Sydney Harbour.

From 44.7m below Birchgrove Oval, Patyegarang began her steady march towards Waverton late on Friday 12 June after final testing wrapped up. It marks the start of the final stage of excavation for the project.

Each one of the TBMs measures 15.7m wide and weighs about 4,350 tonnes — making them the largest TBMs ever assembled underground.

As they move forward, they will line the tunnel with around 13,000 precast concrete segments, building the tunnel structure as they go.

The TBMs are supported by an underground slurry treatment plant that pumps up to three million litres an hour to each TBM, keeping tunnelling stable. The plant then filters and sends the slurry mix back to the TBMs, while the solid rock material separated from the slurry is recycled for other projects.

Built entirely underground to limit local disruption, the slurry treatment plant stretches over 100m long and is up to 15m tall — making it one of the largest plants ever to be assembled and operated underground.

Barangaroo, named alongside Patyegarang in honour of notable Aboriginal women, is not far behind, with assembly 94 per cent complete.

She is expected to begin tunnelling in about four weeks.

Together, the two machines will excavate the final 1.5km of twin motorway tunnels beneath the harbour, reaching depths of up to 50m below sea level.

They will run around the clock, with about 40 people working on them at any one time.

“This is a major milestone for the Western Harbour Tunnel project, marking the beginning of the final stage of excavation under Sydney Harbour,” said NSW Minister for Roads Jenny Aitchison on a recent visit to inspect the final stages of TBM testing.

“Assembling these mega machines entirely underground has been incredibly complex work, and the team is doing a fantastic job.

“Building and operating the tunnel boring machine’s slurry treatment plant underground is not only a major win for the local community, but a significant engineering first for Australia and the world.”

6

$1,650

POA

(HIRE)

2015 DIGGA CB01

  • » Listing Type: Used
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
4

$79,999

2017 ORTECO HD1500

  • » Listing Type: Used
Location marker The shape of a location marker

Melbourne, VIC

0439 560 144
MORE DETAILS
6

$99,000

2014 PAUSELLI HD1200 Tracked HD Solar Piling Rig

  • » Listing Type: Used
Location marker The shape of a location marker

Melbourne, VIC

0439 560 144
MORE DETAILS
6

$99,000

2020 GAYK HRE4000

  • » Listing Type: Used
Location marker The shape of a location marker

Melbourne, VIC

0439 560 144
MORE DETAILS
4

$1,800

POA

(HIRE)

DIGGA CORE BARREL CB100

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
5

$10,550

MOLE 45MM

  • » Listing Type: Used
Location marker The shape of a location marker

Redfern, NSW

02 8999 6293
MORE DETAILS
5

$99,000

PAUSELLI HD1200

  • » Listing Type: Used
Location marker The shape of a location marker

Melbourne, VIC

0439 560 144
MORE DETAILS
6

$115,000

2017 ORTECO HD1500 5M Pile

  • » Listing Type: Used
Location marker The shape of a location marker

Melbourne, VIC

0439 560 144
MORE DETAILS
5

$79,999

2017 ORTECO HD1500

  • » Listing Type: Used
Location marker The shape of a location marker

Melbourne, VIC

0439 560 144
MORE DETAILS
5

$115,000

2017 ORTECO HD1500 5M Pile

  • » Listing Type: Used
Location marker The shape of a location marker

Melbourne, VIC

0439 560 144
MORE DETAILS
13

$10,000

POA

(HIRE)

DIGGA PD50

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
8

$99,000

2015 GAYK HRE4000

  • » Listing Type: Used
Location marker The shape of a location marker

Melbourne, VIC

0439 560 144
MORE DETAILS

Related Posts

Maxi bore HDD performed by Pipe Drillers Group near the Manning River.

Eire Constructions with Pipeline Drillers Group deliver critical Manning River underbore

by William Craske
July 10, 2026

East Coast of Australia based civil construction company Eire Constructions has delivered a critical infrastructure project for MidCoast Council. Following...

Blues Point Reserve was another sensitive area with site constraints.

Out of site

by William Craske
July 9, 2026

It was no small task. Totalling 67 metres, the two sewer pipes identified as part of a bundle of urgent...

Aerial view of picturesque Launceston.

New treated water transfer main to be installed in Launceston

by Staff Writer
July 9, 2026

A new treated water transfer main will be installed as part of a major infrastructure upgrade in Launceston. The project...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Trenchless Australasia is the leading source of news and information in Australia and New Zealand. In addition to being the official publication of the Australasian Society for Trenchless Technology (ASTT) it is also the official media partner of the biggest specialist trenchless technology event in the Southern Hemisphere, No-Dig Down Under.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Us

  • Advertise
  • About
  • Contact
  • Subscribe
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • From the magazine
  • News
  • Featured
  • Utility location
  • Rehabilitation

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
  • Advertise
  • About
  • List Stock
  • Business Directory
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited