• About
  • Advertise
  • Contact
  • Subscribe
  • List Stock
  • Business Directory
Sunday, April 12, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
Home News

Plumbtrax Infrastructure Services puts the Cosmic C500 to the test

by Gerald Lynch
April 22, 2025
in Australia, News
Reading Time: 6 mins read
A A
Cosmic C120 Crawler. Image: Pipe Core

Cosmic C120 Crawler. Image: Pipe Core

When a storm caused severe flooding in North Balwyn, Plumbtrax Infrastructure Services turned to the Cosmic C500 crawler to tackle the blocked stormwater pipe — delivering a fast, efficient solution with minimal disruption.

Plumbtrax Infrastructure Services (Plumbtrax) has earned a reputation for tackling complex plumbing and drainage projects, particularly in UV CIPP. The company’s investment in cutting-edge pipe rehabilitation equipment, including the Cosmic Engineering (Cosmic) C120 and Cosmic C500 crawlers from Pipe Core, has given it the flexibility and capability to take on some of the most challenging pipeline renewal projects.

In early March 2025, the Plumbtrax pipe rehabilitation team was called to North Balwyn after a storm caused significant flooding in a residential area. Residents had reported overflowing pits to the council, and the cause was traced back to a DN600 stormwater pipeline located in a council easement behind several properties.

“After a severe storm, residents reported overflow from a nearby pit, prompting the council to investigate,” the Plumbtrax operator said.

Upon inspection via one of two 450mm x 600mm manholes along the line, the team found multiple displacements and root intrusions at the pipe joints. While some of the roots were cleared using a chain knocker, others were too large and required milling before any relining could take place.

The DN600 pipeline called for the heavy-duty Cosmic C500, its first major test since joining the Plumbtrax fleet. Plumbtrax had been waiting for the right project to put this heavy-duty system to work, and North Balwyn provided the perfect opportunity.

The crew deployed the C500 from their custom-fitted van, which features a built-in slide to move the system in and out of the vehicle, as well as a dedicated water tank to keep the electric cutting unit of the robot cool during operation. Lowering the robust system into the pit with an excavator and winch, they prepared for an intensive multi-day rehabilitation process.

The Cosmic C500 was tasked with trimming the larger intruding roots, installing patches, cutting out two house connections, and performing a final clean after relining. Over four days, the Plumbtrax crew worked efficiently to complete the job, which also included high-pressure cleaning and CCTV inspections.

Plumbtrax highlighted the importance of the right equipment for these types of projects and explained the council’s reasonable project expectations.

“When working for the council, safety is a priority. This allows our team to operate efficiently without the pressure of unrealistic deadlines,” the Plumbtrax operator said.

Plumbtrax relies on Cosmic’s relining materials and supply of these from local distributor Pipe Core, ensuring consistency across all their projects. While the team frequently uses the C120 for smaller-diameter pipes, they found the C500 to be just as user-friendly but for larger-scale applications.

“We use the C120 a lot, it’s easy to get the hang of,” the Plumbtrax operator said.

One feature the team particularly appreciated was the Cosmic system’s cleaning lens jets, which provide clear visibility even in tough conditions.

“It’s one of my favourite features of both the C120 and C500,” the Plumbtrax operator said. “The lens is cleaned through small jets, which is great when grinding out concrete. It’s controlled manually from the operator’s station.”

Efficiency was also key. With Cosmic’s fast-curing patches, the team minimised disruption to the surrounding residents.

“Patching with the Cosmic system is one of the quickest methods for us. The patches we installed only took 10 minutes to cure and will increase the pipe’s lifespan by up to 50 years,” the Plumbtrax operator said.

With the North Balwyn stormwater system fully restored, Plumbtrax has once again demonstrated its ability to execute high-stakes rehabilitation projects with precision.

The company’s investment in the Cosmic system, backed by Pipe Core’s supply and support, positions it at the forefront of pipeline rehabilitation, ready for the next challenge.

5

$2,875

POA

(HIRE)

2014 DIGGA PD3

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
6

$1,650

POA

(HIRE)

2015 DIGGA CB01

  • » Listing Type: Used
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
4

$1,800

POA

(HIRE)

DIGGA CORE BARREL CB100

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
1

$1,690

TANNERTRACK - Hydraulic Post Hole Digger - Many auger sizes available

  • » Listing Type: New
Location marker The shape of a location marker

Pakenham, VIC

03 8547 8769
MORE DETAILS
18

$62,950

2011 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
19

$82,950

2018 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
13

$10,000

POA

(HIRE)

DIGGA PD50

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
Premium Ad
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sunshine West, VIC

03 9999 3372
MORE DETAILS
15

$28,000

1995 DITCH WITCH JT820

  • » Listing Type: Used
Location marker The shape of a location marker

Dalby, QLD

07 3171 1722
MORE DETAILS
1

$2,600

RED ROO NA

  • » Listing Type: Used
Location marker The shape of a location marker

Eltham, VIC

03 8373 7151
MORE DETAILS
5

$1,495

POWERTECH HONDA GX50 CORE DRILL

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS
5

$1,395

POWERTECH CORE DRILL STAND (ONLY) TO SUIT PCD-352

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS

Related Posts

Watermain installation at Lethbridge in Victoria.

Latest trenchless tenders drop for Yass, Bankstown, Manor Lakes, Laverton North

by Staff Writer
April 9, 2026

Trenchless Australasia has teamed up with Australian Tenders to bring readers the latest trenchless tenders.   North East Water Minor...

The Picote’s Flexi-Sliplining system being deployed.

First ever Picote Flexi-Sliplining installation made in Australasia

by Staff Writer
April 7, 2026

Plumbtrax Infrastructure Services has successfully completed the first installation of Picote Flexi-Sliplining technology. It marks a significant milestone for the...

A giant gantry lowers a TBM cutterhead into the launch box.

Giant cutterhead craned into place for T2D TBMs

by Staff Writer
April 2, 2026

The final piece of the road corridor that will link Adelaide’s north to the south is another step closer to...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Trenchless Australasia is the leading source of news and information in Australia and New Zealand. In addition to being the official publication of the Australasian Society for Trenchless Technology (ASTT) it is also the official media partner of the biggest specialist trenchless technology event in the Southern Hemisphere, No-Dig Down Under.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Us

  • Advertise
  • About
  • Contact
  • Subscribe
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • From the magazine
  • News
  • Featured
  • Utility location
  • Rehabilitation

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
  • Advertise
  • About
  • List Stock
  • Business Directory
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited