• About
  • Advertise
  • Contact
  • Subscribe
  • List Stock
  • Business Directory
Saturday, April 11, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
Home

Record-breaking rockhead flies through fifth tunnel

by
November 25, 2011
in From the magazine, Microtunnelling, Pipe jacking, Tunnelling
Reading Time: 2 mins read
A A

The record was achieved while boring the fifth and longest of seven tunnels at the Shayler Run Segment C Sewer Replacement Project.

“One of the only limitations on distance was ventilation inside the tunnel,” said Steve Abernathy, Vice President of Operations for contractor Midwest Mole, Inc.

“Our ventilation has a limited duct diameter due to the small size of the tunnel. We can adequately ventilate 600 m tunnels, but we would need larger fans for anything longer.”

The distance of the individual bores is not the only challenge “Ó the vertical alignment changes over the course of tunnelling by 54 m, resulting in soft shale and limestone at the outset that gives way to harder shale and limestone deeper underground.

Robbins designed the unique tunnelling machine for these conditions, with a mixed ground cutterhead for five of the seven bores. A hard rock cutterhead mounted with 11.5 inch disc cutters will be used for the last two in harder rock.

“We finally had to change some of the 6.5 inch diameter cutters on the mixed ground cutterhead during this drive “Ó we haven’t had to do that for any of the other bores. The ground is definitely tougher,” said Mr Abernathy of the fifth drive. The crew switched to the hard rock cutterhead for the sixth, 319 m long bore.

As the machine excavates, crews adjust the line and grade continuously from an in-shield operator’s console. Articulation cylinders allow for adjustments, while the machine’s position is monitored with a laser targeting system. The self-propelled Double Shield Rockhead also allows for installation of a primary liner, in this case ring beam and board, from within the tail shield. Even with liner installation, production rates have been high “Ó up to 21 m in one 12-hour shift, and 12 to 18 m per shift on average.

The entire 2,870 m pipeline is being constructed for the Clermont County, Ohio Water Resources Department. Once complete, the $A15 million project will upgrade an exposed sewer system and protect an area surrounding environmentally-sensitive Shayler Creek. All tunnelling is expected to be complete by mid-2012.

13

$10,000

POA

(HIRE)

DIGGA PD50

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
5

$2,875

POA

(HIRE)

2014 DIGGA PD3

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
4

$1,800

POA

(HIRE)

DIGGA CORE BARREL CB100

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
1

$1,690

TANNERTRACK - Hydraulic Post Hole Digger - Many auger sizes available

  • » Listing Type: New
Location marker The shape of a location marker

Pakenham, VIC

03 8547 8769
MORE DETAILS
18

$62,950

2011 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
19

$82,950

2018 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
6

$1,650

POA

(HIRE)

2015 DIGGA CB01

  • » Listing Type: Used
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
Premium Ad
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sunshine West, VIC

03 9999 3372
MORE DETAILS
21

$320,000

2006 ATLAS COPCO E2C

  • » Listing Type: Used
  • » Category: Carrier Mounted
Location marker The shape of a location marker

Dubbo, NSW

02 8315 0022
MORE DETAILS
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sydney, NSW

02 8999 7036
MORE DETAILS
6

$1,210,000

XCMG XR240E ROTARY PILING RIG

  • » Listing Type: New
Location marker The shape of a location marker

Brisbane City, QLD

07 3177 1695
MORE DETAILS
6

$2,395

POWERTECH CORE DRILL 352D

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS

Related Posts

Concrete pipes for the Morgan to Whyalla Pipeline.

Major milestone reached on $61M pipeline upgrade

by Staff Writer
April 2, 2026

SA Water has reached a significant milestone in a $61.8 million upgrade to South Australia’s longest pipeline. Crews are currently...

Image: LINX Port Services

Herrenknecht tunnel boring machines arrive in Western Port

by Staff Writer
April 1, 2026

LINX Port Services has supported the delivery of the latest tunnel boring machines for the Suburban Rail Loop. The eagerly...

Attendees at No-Dig Down Under inspect drill rigs.

No Missing No-Dig

by Staff Writer
March 26, 2026

International No-Dig Auckland provides an unparalleled opportunity to connect with the global trenchless technology industry. Hosted each year in a...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Trenchless Australasia is the leading source of news and information in Australia and New Zealand. In addition to being the official publication of the Australasian Society for Trenchless Technology (ASTT) it is also the official media partner of the biggest specialist trenchless technology event in the Southern Hemisphere, No-Dig Down Under.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Us

  • Advertise
  • About
  • Contact
  • Subscribe
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • From the magazine
  • News
  • Featured
  • Utility location
  • Rehabilitation

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
  • Advertise
  • About
  • List Stock
  • Business Directory
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited