• About
  • Advertise
  • Contact
  • Subscribe
  • List Stock
  • Business Directory
Sunday, April 12, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
Home Installation HDD

Record-breaking installation of HDD bore

by Gerald Lynch
January 24, 2025
in HDD, News
Reading Time: 3 mins read
A A
Longest HDD Bore - Goodeng Drill worksite. Image: JB Trenchless

Longest HDD Bore - Goodeng Drill worksite. Image: JB Trenchless

India has achieved a remarkable milestone with the completion of the longest horizontal directional drilling (HDD) bore to date.

Spanning an impressive 4102m beneath the Brahmaputra River, this record-breaking installation was part of the North East Gas Grid Pipeline Project.

The project highlights the growing importance of HDD technology for complex infrastructure development.

While not directly contributing to this job in India, JB Trenchless stands as Australia premier supplier of HDD rigs, tooling, and equipment. Whether tackling local or large-scale projects, JB Trenchless is your trusted partner in trenchless technology.

The North East Gas Grid Pipeline Project

Designed to meet the growing energy demands of India’s northeastern region, the North East Gas Grid Pipeline Project promises to deliver clean fuel to domestic, industrial, and commercial sectors. This ambitious initiative will not only enhance access to sustainable energy but also boost industrial and economic growth in the region.

The project’s standout achievement was the installation of twin pipelines beneath the Brahmaputra River, executed by NRP Projects Private Limited (NRP).

With a 4102m crossing at a depth of 47m, the HDD installation demonstrated cutting-edge engineering and environmental stewardship by preserving the integrity of the river ecosystem.

Why HDD technology?

HDD was selected for this project for its precision, efficiency, and ability to navigate environmentally sensitive terrains. Unlike traditional open-cut methods, HDD minimises environmental disruption by drilling a pilot bore beneath the riverbed, progressively enlarging it to accommodate the required pipeline diameter.

This particular installation utilised the intersect method, where two pilot bores were drilled from opposite sides of the river to meet at a central point. This technique ensured accuracy over the record-setting distance while maintaining the riverbed’s natural state.

As a leading supplier of HDD equipment in Australia, JB Trenchless offers the same innovative technology and expertise to help you achieve success in complex projects. From advanced HDD rigs to precision tooling, they provide solutions that meet the highest industry standards.

Equipment and tools: Enabling success

For the Brahmaputra River project, NRP deployed advanced equipment, including two XCMG XZ6600 rigs for pilot and reaming operations and a Goodeng GS8000-LS HDD rig for the main pipeline pull. These rigs, with pullback capacities of 660 and 800 tons, respectively, were critical to the operation’s success.

JB Trenchless is proud to be the Australian and New Zealand dealer for Goodeng Equipment, a global leader in HDD technology.

Goodeng offers a versatile range of HDD rigs, from compact 5-ton machines to powerful 1200-ton maxi rigs, designed to handle projects of any scale with precision and reliability.

Overcoming challenges: Precision and persistence

Executing a project of this magnitude came with challenges, including limited site access, frequent rains, and the need to work within a narrow four-month window to avoid monsoon season. NRP invested heavily in infrastructure improvements, including road upgrades and deploying additional excavators to accelerate progress.

Despite these obstacles, the HDD team completed the twin bores within the stipulated timeline, achieving the 4102m record.

The project involved installing a 6-inch conduit pipe and a 24-inch gas main. The conduit pipe pilot bore began on October 28, 2022, and was completed in 55 days. The gas main bore started on January 7, 2023, and concluded in 86 days, with the final pull-in operation lasting an impressive 56 continuous hours.

JB Trenchless: Your HDD partner

JB Trenchless delivers expertise and innovation to HDD projects across Australia.

As your one-stop shop, we supply Goodeng HDD rigs, mud pumps, tooling, and consumables to tackle any terrain. More than a supplier, we’re your partner, offering customised solutions to ensure your project’s success, no matter the size or complexity.

Subscribe to Trenchless Australasia for the latest project and industry news.

5

$2,875

POA

(HIRE)

2014 DIGGA PD3

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
6

$1,650

POA

(HIRE)

2015 DIGGA CB01

  • » Listing Type: Used
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
4

$1,800

POA

(HIRE)

DIGGA CORE BARREL CB100

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
1

$1,690

TANNERTRACK - Hydraulic Post Hole Digger - Many auger sizes available

  • » Listing Type: New
Location marker The shape of a location marker

Pakenham, VIC

03 8547 8769
MORE DETAILS
18

$62,950

2011 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
19

$82,950

2018 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
13

$10,000

POA

(HIRE)

DIGGA PD50

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
Premium Ad
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sunshine West, VIC

03 9999 3372
MORE DETAILS
15

$28,000

1995 DITCH WITCH JT820

  • » Listing Type: Used
Location marker The shape of a location marker

Dalby, QLD

07 3171 1722
MORE DETAILS
1

$2,600

RED ROO NA

  • » Listing Type: Used
Location marker The shape of a location marker

Eltham, VIC

03 8373 7151
MORE DETAILS
5

$1,495

POWERTECH HONDA GX50 CORE DRILL

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS
5

$1,395

POWERTECH CORE DRILL STAND (ONLY) TO SUIT PCD-352

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS

Related Posts

Watermain installation at Lethbridge in Victoria.

Latest trenchless tenders drop for Yass, Bankstown, Manor Lakes, Laverton North

by Staff Writer
April 9, 2026

Trenchless Australasia has teamed up with Australian Tenders to bring readers the latest trenchless tenders.   North East Water Minor...

The Picote’s Flexi-Sliplining system being deployed.

First ever Picote Flexi-Sliplining installation made in Australasia

by Staff Writer
April 7, 2026

Plumbtrax Infrastructure Services has successfully completed the first installation of Picote Flexi-Sliplining technology. It marks a significant milestone for the...

A giant gantry lowers a TBM cutterhead into the launch box.

Giant cutterhead craned into place for T2D TBMs

by Staff Writer
April 2, 2026

The final piece of the road corridor that will link Adelaide’s north to the south is another step closer to...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Trenchless Australasia is the leading source of news and information in Australia and New Zealand. In addition to being the official publication of the Australasian Society for Trenchless Technology (ASTT) it is also the official media partner of the biggest specialist trenchless technology event in the Southern Hemisphere, No-Dig Down Under.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Us

  • Advertise
  • About
  • Contact
  • Subscribe
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • From the magazine
  • News
  • Featured
  • Utility location
  • Rehabilitation

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
  • Advertise
  • About
  • List Stock
  • Business Directory
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited