• About
  • Advertise
  • Contact
  • Subscribe
  • List Stock
  • Business Directory
Sunday, April 12, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
Home

Rodney Council pipe installation

by Staff Writer
July 22, 2009
in From the magazine, HDD
Reading Time: 4 mins read
A A

The installation of this pipeline in Tindalls Bay eliminated the need to upgrade an existing pump station, providing the Rodney District Council with a $NZ2 million saving.

The pipe installation was part of a much larger project that included the installation of a pipeline the full length of the Whangaparaoa Peninsula, 25 km north of Auckland. The pipeline was largely installed by open cut but included seven directional drills.

The proposed pipeline route began under the watchful eyes of local residents at the Tindalls Bay pump station, situated adjacent to the Tindalls Bay beach.

A Vermeer D80 drill rig was placed into a cut out bank and was set up on line and grade at the Tindalls Bay pump station. From here the proposed pipeline route passed through 30 m of unstable ground before entering into hard siltstone. The 30 m of soft ground was formed during a pre-historic landslide and high value homes have now been built over the area. It was imperative that the hydrostatic water pressure at the slip zone was not increased. As a precaution, four slotted dewatering drains were installed into the clay and up to the rock interface, removing excess water from the ground and offsetting any hydraulic loading caused by the drilling operation.

Due to the depth of this drill a magnetic north steering tool located in a non-magnetic steering head utilising true magnetic north was used to obtain direction. A wire inside every drill rod transports the electronic information back to the drill operator and is displayed on a laptop. Special computer software interprets the transmitter information and plots a long section and plan of the pilot drills progression. It also displays the calculated drill head position.

Once into the siltstone the pipeline route continues to climb at 4.8 per cent grade and quickly reached a depth of 40 m as it passed under the ridge. After a further 150 m it exited the ground in a swampy gully. As a result of the unstable, saturated ground in the gully it was necessary to install a 1 m diameter steel casing 30 m along the pipeline route down to the rock interface. A 200 mm diameter PVC sleave was also installed into the clay at the drill end to support the drill rods and to hold the pilot hole open.

The siltstone was hard. Traditional ripper type reamers require huge toque and produce large particle cuttings that are not easily removed from the tunnel. A steel tooth tri-cone reamer was built in-house with a diameter of 760 mm. By grinding the stone the particle size was reduced and then better suspended in the drilling fluid.

Plenty of water was required, and council water on the Peninsula is unavailable in summer. The options were to truck water in and truck the drilling fluid with cuttings to the tip site (20 km away), obtain resource consent to remove water from the sea/truck drill fluid with cuttings to tip site, or recycle drilling fluid and take cuttings only to the tip site. Smythe decided to use the drill fluid recycle option.

The drilling fluid was pumped up to the cutting face and then travelled down the pilot hole (around the drill rod) and was collected in a pit at the drill. The silt laden fluid was then pumped into the fluid recycler. After removal of the solids the fluid was fed back to the drill where it was pumped back up to the face and undertook another cycle. This method saved pumping the cleaned fluid from one end of the project to the other.

When the siltstone was fully reamed, the reamer was backed out of the hole. It was decided not to ream the final 30 m as the ground was unstable and we suspected that it would collapse causing damage to the driveways above and possibly buildings near by.

When the reaming was complete the pre-welded and tested 710 mm diameter, SDR10, polyethylene pipe string was placed on round posts to aid in the movement of the pipe up Hobbs Road. The pipe string was 400 m long and weighed a total of 48 tonnes. The pipe was connected to the drill string and pulled into the tunnel. The pipe insertion required 14 men, three excavators and one tow truck to maynover the pipe as it was pulled up Hobbs Road. The pipe installation was completed in 6 hours. The final 30m of clay was reamed during the pipe insertion and the pipe/tunnel anulus was then pressure grouted at each end with a cement based grout and the connection to the pump station and trenched section was undertaken.

5

$2,875

POA

(HIRE)

2014 DIGGA PD3

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
6

$1,650

POA

(HIRE)

2015 DIGGA CB01

  • » Listing Type: Used
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
4

$1,800

POA

(HIRE)

DIGGA CORE BARREL CB100

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
1

$1,690

TANNERTRACK - Hydraulic Post Hole Digger - Many auger sizes available

  • » Listing Type: New
Location marker The shape of a location marker

Pakenham, VIC

03 8547 8769
MORE DETAILS
18

$62,950

2011 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
19

$82,950

2018 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
13

$10,000

POA

(HIRE)

DIGGA PD50

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
Premium Ad
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sunshine West, VIC

03 9999 3372
MORE DETAILS
15

$28,000

1995 DITCH WITCH JT820

  • » Listing Type: Used
Location marker The shape of a location marker

Dalby, QLD

07 3171 1722
MORE DETAILS
1

$2,600

RED ROO NA

  • » Listing Type: Used
Location marker The shape of a location marker

Eltham, VIC

03 8373 7151
MORE DETAILS
5

$1,495

POWERTECH HONDA GX50 CORE DRILL

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS
5

$1,395

POWERTECH CORE DRILL STAND (ONLY) TO SUIT PCD-352

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS

Related Posts

The completed bore arrived on the exact grade and alignment required to connect seamlessly into the existing manhole.

S&Z Australia masters rocky terrain with HDD in Bendigo

by Staff Writer
April 2, 2026

S&Z Australia recently completed tricky horizontal directional drilling (HDD) works in difficult conditions in Bendigo. Engaged by Leech Earthmoving Contracting...

Crews prepare the pipeline installation for Bribie Island.

Unitywater adopts trenchless techniques for Bribie Island pipeline upgrades

by Staff Writer
April 2, 2026

Horizontal Directional Drilling (HDD) and auger boring will be used for the water main upgrade on Bribie Island Road, Caboolture,...

Attendees at No-Dig Down Under inspect drill rigs.

No Missing No-Dig

by Staff Writer
March 26, 2026

International No-Dig Auckland provides an unparalleled opportunity to connect with the global trenchless technology industry. Hosted each year in a...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Trenchless Australasia is the leading source of news and information in Australia and New Zealand. In addition to being the official publication of the Australasian Society for Trenchless Technology (ASTT) it is also the official media partner of the biggest specialist trenchless technology event in the Southern Hemisphere, No-Dig Down Under.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Us

  • Advertise
  • About
  • Contact
  • Subscribe
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • From the magazine
  • News
  • Featured
  • Utility location
  • Rehabilitation

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
  • Advertise
  • About
  • List Stock
  • Business Directory
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited