• About
  • Advertise
  • Contact
  • Subscribe
  • List Stock
  • Business Directory
Sunday, April 12, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
Home News

TBMs tunnel through Sydney Metro West

by Gerald Lynch
March 7, 2025
in Australia, News, Tunnelling
Reading Time: 2 mins read
A A
Image: Transport for NSW

Image: Transport for NSW

Trenchless works are powering the Sydney Metro West tunnels forward in a major project milestone.

Two tunnel boring machines (TBMs) constructing the mega Sydney Metro West tunnels have made a smashing entrance 24-metres below the surface at the Clyde Metro junction caverns.

This latest milestone means that over 80 per cent of the 24km twin metro railway tunnels for this city-shaping project that the Minns Labor Government is using to drive housing uplift has been completed.

TBM Dorothy broke through the solid rock walls to arrive at the giant junction caverns last month, after spending three months tunnelling 1.1km from Clyde.

TBM Betty was tracking slightly ahead, arriving at Clyde junction caverns in December last year. TBM Betty spent seven weeks traversing the cavern is now tunnelling towards Parramatta.

This junction cavern at Clyde will play a critical role in the Sydney Metro network as it connects the metro tunnels with the above ground stabling and maintenance facility, where the network’s new fleet of trains will be housed when not in service.

Since starting their westward tunnelling journey in September 2024, TBMs Betty and Dorothy have been working around the clock to excavate about 200 metres of tunnel each week.

So far, the TBMs have carved out 5.7km of twin tunnels between Sydney Olympic Park and Clyde, removing more than 1.1 million tonnes of material, equivalent to about 180 Olympic-size swimming pools.

Along the way, the TBMs have installed more than 41,000 precast concrete segments to line the new tunnel walls. Each precast segment weighs about 3.8 tonnes, with six segments pieced together to form one ring around the tunnel.

Both TBMs will now build a further 1.1km section of tunnels to reach the site of the future Parramatta Metro Station by mid-year.

New South Wales Premier Chris Minns said it was a major step for Western Sydney.

“These fast and reliable new metro services will double rail capacity between the Sydney CBD and Parramatta and will be a game-changer, getting more people around our city faster,” he said.

“I want to thank the thousands of workers who have gotten this project to this point and will be working around the clock until Australia’s largest public transport project is opened.”

Rail capacity between the Sydney CBD and Parramatta is set to be doubled upon completion of the project.

Subscribe to Trenchless Australasia for the latest project and industry news

5

$2,875

POA

(HIRE)

2014 DIGGA PD3

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
6

$1,650

POA

(HIRE)

2015 DIGGA CB01

  • » Listing Type: Used
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
4

$1,800

POA

(HIRE)

DIGGA CORE BARREL CB100

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
1

$1,690

TANNERTRACK - Hydraulic Post Hole Digger - Many auger sizes available

  • » Listing Type: New
Location marker The shape of a location marker

Pakenham, VIC

03 8547 8769
MORE DETAILS
18

$62,950

2011 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
19

$82,950

2018 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
13

$10,000

POA

(HIRE)

DIGGA PD50

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
Premium Ad
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sunshine West, VIC

03 9999 3372
MORE DETAILS
15

$28,000

1995 DITCH WITCH JT820

  • » Listing Type: Used
Location marker The shape of a location marker

Dalby, QLD

07 3171 1722
MORE DETAILS
1

$2,600

RED ROO NA

  • » Listing Type: Used
Location marker The shape of a location marker

Eltham, VIC

03 8373 7151
MORE DETAILS
5

$1,495

POWERTECH HONDA GX50 CORE DRILL

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS
5

$1,395

POWERTECH CORE DRILL STAND (ONLY) TO SUIT PCD-352

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS

Related Posts

Watermain installation at Lethbridge in Victoria.

Latest trenchless tenders drop for Yass, Bankstown, Manor Lakes, Laverton North

by Staff Writer
April 9, 2026

Trenchless Australasia has teamed up with Australian Tenders to bring readers the latest trenchless tenders.   North East Water Minor...

The Picote’s Flexi-Sliplining system being deployed.

First ever Picote Flexi-Sliplining installation made in Australasia

by Staff Writer
April 7, 2026

Plumbtrax Infrastructure Services has successfully completed the first installation of Picote Flexi-Sliplining technology. It marks a significant milestone for the...

A giant gantry lowers a TBM cutterhead into the launch box.

Giant cutterhead craned into place for T2D TBMs

by Staff Writer
April 2, 2026

The final piece of the road corridor that will link Adelaide’s north to the south is another step closer to...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Trenchless Australasia is the leading source of news and information in Australia and New Zealand. In addition to being the official publication of the Australasian Society for Trenchless Technology (ASTT) it is also the official media partner of the biggest specialist trenchless technology event in the Southern Hemisphere, No-Dig Down Under.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Us

  • Advertise
  • About
  • Contact
  • Subscribe
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • From the magazine
  • News
  • Featured
  • Utility location
  • Rehabilitation

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
  • Advertise
  • About
  • List Stock
  • Business Directory
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited