• About
  • Advertise
  • Contact
  • Subscribe
  • List Stock
  • Business Directory
Wednesday, July 22, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
Home News

Townsville suburb’s infrastructure resilience program hits milestone

by Staff Writer
June 15, 2026
in Gravity sewer link, HDD, Horizontal directional drilling (HDD), Installation, Microtunnelling, News, Queensland, Sewer networks, Sewer upgrades, Townsville City Council, Wastewater
Reading Time: 2 mins read
A A
View over Townsville towards Mt Stuart.

View over Townsville to Mount Stuart in Queensland. Image: Stephen Gibson/stock.adobe.com

The first stage of a key wastewater infrastructure resilience program is now complete in a Townsville suburb with a history of sewerage issues.

Wulguru, the outer southern residential area, has achieved the on-schedule completion of Stage 1 at a cost of $2.2 million.

This significantly increases the volume of wastewater that can be transported from the network above Wright Street and paves the way for essential Stage 2 work to start next week.

Stage 2 involves extending a pipeline under Stuart Drive to connect with an existing larger trunk gravity sewer located at the intersection of Stuart Drive and Edison Street.

Around 600m of pipe will be installed, including a 45m trenchless section under Stuart Drive, bringing the total amount of pipe laid across both stages to almost one kilometre.

Townsville Mayor Nick Dametto said he had been carefully monitoring progress at Wulguru over the past few months, and was pleased Council and its contractors, KB Pipelines, were powering towards a December completion date for the two-stage project.

“Wulguru residents have put up with this problem for too long, and I acknowledge how difficult this issue has been for them – one of Council’s main priorities is ensuring that our critical infrastructure is upgraded to be fit-for-purpose,” Dametto said.

“More than $6 million has been invested in this project by both Council and the State Government through the Works for Queensland Program.

“This significant commitment reflects our renewed Back to Basics focus – delivering a reliable wastewater system that meets community needs and doesn’t fail after a medium amount of rainfall is essential.”

Divisional councillor Brady Ellis said he was relieved the project was due to be completed before the next wet season.

“This issue has caused a lot of angst for residents in Division 10 over the years and, since being elected, I have made addressing it one of my top priorities,” Ellis said.

“Once again, I want to acknowledge the work and support of State Member for Mundingburra, Janelle Poole APM MP, and the Crisafulli Government for coming on board as a funding partner for the first stage of this critical project through the Works for Queensland Program.

“It has been great to work with them to deliver this project that will make a huge difference to hundreds of homes in Wulguru.”

Stage 2 of the program will cost approximately $4.5 million, to be entirely funded by Council.

5

$69,999

2017 ORTECO HD1500

  • » Listing Type: Used
Location marker The shape of a location marker

Melbourne, VIC

0439 560 144
MORE DETAILS
19

$75,950

2018 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
5

$10,550

MOLE 45MM

  • » Listing Type: Used
Location marker The shape of a location marker

Redfern, NSW

02 8999 6293
MORE DETAILS
6

$79,000

2020 GAYK HRE4000

  • » Listing Type: Used
Location marker The shape of a location marker

Melbourne, VIC

0439 560 144
MORE DETAILS
8

$79,000

2015 GAYK HRE4000

  • » Listing Type: Used
Location marker The shape of a location marker

Melbourne, VIC

0439 560 144
MORE DETAILS
6

$1,650

POA

(HIRE)

2015 DIGGA CB01

  • » Listing Type: Used
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
6

$69,999

2017 ORTECO HD1500 5M Pile

  • » Listing Type: Used
Location marker The shape of a location marker

Melbourne, VIC

0439 560 144
MORE DETAILS
7

$69,999

ORTECO HD1500 5M Pile

  • » Listing Type: Used
Location marker The shape of a location marker

Melbourne, VIC

0439 560 144
MORE DETAILS
5

$2,875

POA

(HIRE)

2014 DIGGA PD3

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
6

$69,000

2014 PAUSELLI HD1200 Tracked HD Solar Piling Rig

  • » Listing Type: Used
Location marker The shape of a location marker

Melbourne, VIC

0439 560 144
MORE DETAILS
4

$1,800

POA

(HIRE)

DIGGA CORE BARREL CB100

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
13

$10,000

POA

(HIRE)

DIGGA PD50

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS

Related Posts

Training at Victorian Tunnelling Centre.

SRL East unveils world-first all female tunnelling team

by Staff Writer
July 22, 2026

With 18 women now on board, Suburban Rail Loop (SRL) East's all-women tunnel boring machine (TBM) crew is undertaking specialist...

Watercare and members of the joint venture celebrate the opening.

Auckland’s $1.6B wastewater tunnel goes live

by Staff Writer
July 21, 2026

Watercare’s Central Interceptor wastewater tunnel is now fully operational in Auckland. The $1.66 billion project – New Zealand’s largest-ever wastewater...

Wentworth ANZAC war memorial.

Insituform embarks on relining works for Wentworth Shire Council

by Staff Writer
July 21, 2026

Sewer rehabilitation is being conducted by Insituform on behalf of Wentworth Shire Council. Following successful completion last year of sewer...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Trenchless Australasia is the leading source of news and information in Australia and New Zealand. In addition to being the official publication of the Australasian Society for Trenchless Technology (ASTT) it is also the official media partner of the biggest specialist trenchless technology event in the Southern Hemisphere, No-Dig Down Under.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Us

  • Advertise
  • About
  • Contact
  • Subscribe
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • From the magazine
  • News
  • Featured
  • Utility location
  • Rehabilitation

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
  • Advertise
  • About
  • List Stock
  • Business Directory
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited