• About
  • Advertise
  • Contact
  • Subscribe
  • List Stock
  • Business Directory
Saturday, April 11, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
  • Latest News
  • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
No Results
View All Results
Home

Tunnelling industry news

by Staff Writer
December 3, 2009
in From the magazine, Microtunnelling, Tunnelling
Reading Time: 5 mins read
A A

The 2.4 km tunnel is expected to make road travel in Auckland faster, easier and less expensive by eliminating a major chokepoint on one of the busiest stretches of the motorway network.

The project, to be completed using a “÷cut and cover’ method, includes the construction of a 440 mm diameter tunnel beneath Victoria Park in central Auckland to carry three lanes of northbound traffic. The existing Victoria Park viaduct will be retained as four southbound lanes.

The scope of the project also involves improvement of pedestrian access over the motorway to the harbour, protection of heritage sites and reinstatement of Victoria Park.

Though work has already begun at St Mary’s Bay between Victoria Park and the Auckland Harbour Bridge, full construction of the tunnel will commence in 2010. The project is being built by the Victoria Park Alliance, comprising of the NZTA, Fletcher Construction, Beca Infrastructure, Higgins, and Parsons Brinckerhoff.

At an estimated cost of $NZ400 million, the project will provide 450 jobs. The tunnel is expected to be completed by 2011 before Auckland hosts the World Cup.

Tunnel under Toolangi completed

The Sugarloaf Pipeline Project involves the construction of a 70 km pipeline linking the Goulburn River near Yea to the Sugarloaf Reservoir in Melbourne’s northeast, including an 830 m tunnel completed with a tunnel boring machine.

The 1.75 m diameter pipeline is designed to allow the transfer of 75 billion litres of water to Melbourne by 2010 as part of the Food Bowl Modernisation Project.

John Holland Group has been awarded the contract to construct the pipeline. The contract is an alliance between Melbourne Water, John Holland and designers Sinclair Knight Mertz and GHD.

An $A8 million remote controlled tunnel boring machine (TBM) completed the 830 m tunnel under the Toolangi State Forest to make way for the water pipeline.

Spokesperson for the Alliance Denise Hurley said stringent environmental approval processes and many months of preparation went into preparing the site for Ollie (the TBM).

“The Alliance’s tunnel team had to dig a launch shaft and assemble a bridge crane to lower the machine into the shaft. The four key components of Ollie, shipped from Germany, then had to be assembled, tested and lowered into place,” she said.

The TBM, nicknamed “÷Ollie’ after the world’s biggest earthworm the Giant Gippsland Earthworm (Oligochaetra), was manufactured especially for the rock encountered in the area.

A Herrenknecht AVN 1800 TD (with an extension kit to suit 2,000 ID / 2,400 OD pipes) was used to excavate the tunnel,

700 m of which was through rock with strengths ranging from 80-250 MPa. The final 130 m was excavated through soft colluvial material.

Alliance Project Manager Rob Cranston said the successful completion of the tunnel marked a major milestone in the pipeline project. Mr Cranston congratulated Project Manager Sam Jones and his team on successfully completing the tunnel earlier than expected.

Tunnelling began on 1 April 2009 and took ten weeks. A crew of ten worked 24 hours a day, six days a week to complete the drive. Workers have dismantled the tunnel boring equipment.

Sydney Metro stage one shortlist

The Sydney Metro is set to be the biggest infrastructure project in Sydney’s CBD since the construction of the Harbour Bridge.

Design work on the first stage of the Sydney Metro network is underway and construction will begin in 2010 to enable the metro to be opened to the public in 2015.

Three consortia made up of national and international companies have been shortlisted for Sydney Metro’s major construction and tunnelling contract.

The three consortia will now compete for the contract to develop the Permanent Route Infrastructure (PRI) for the Sydney Metro, stage one, Central to Rozelle.

They are (in no particular order):

Line 1 – McConnell Dowell Corporation / Abigroup / Obayashi Corporation

Metro Primo – Leighton Contractors / S.E.L.I. Spa

Thiess / John Holland JV – Thiess / John Holland JV

The PRI contract will involve the major tunnelling work for the seven kilometre route between Central and Rozelle.

The works to be carried out by the successful company will also include:

  • Constructing the structural lining in the tunnel, drainage, cross passages and other work; and
  • Excavating the underground stations and passenger entrances.

The contract will be awarded to the successful consortium in the second quarter of 2010.

Pipelines bound for Botany Bay

The construction of twin seven km pipelines crossing Botany Bay, located in New South Wales, has been completed as part of the water delivery infrastructure component of the Sydney Desalination Project.

The dual pipeline is expected to be connected to a single 1.8 m diameter pipe that has been laid offshore from Silver Beach, Kurnell. Three tunnel boring machines bored an 800 m drive to minimise the disturbance to residents and also to protect unique tracts of seagrass along the Botany Bay floor.

The $A650 million, 18 km pipeline and its associated infrastructure and systems will carry the desalinated water from Kurnell, across Botany Bay, to the city’s main water supply, the City Water Tunnel at Erskineville. The pipelines will initially transport 250 million litres of drinking water a day from the desalination plant and can carry 500 million litres of water a day if required in the future.

Blue Water – a joint venture between Veolia and John Holland – is building the desalination plant at Sir Joseph Banks Drive, Kurnell, and building the sea tunnels that connect to the intake and outlet structures 300 m offshore in the Tasman Sea.

13

$10,000

POA

(HIRE)

DIGGA PD50

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
5

$2,875

POA

(HIRE)

2014 DIGGA PD3

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
4

$1,800

POA

(HIRE)

DIGGA CORE BARREL CB100

  • » Listing Type: New
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
1

$1,690

TANNERTRACK - Hydraulic Post Hole Digger - Many auger sizes available

  • » Listing Type: New
Location marker The shape of a location marker

Pakenham, VIC

03 8547 8769
MORE DETAILS
18

$62,950

2011 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
19

$82,950

2018 VERMEER PD10

  • » Listing Type: Used
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
6

$1,650

POA

(HIRE)

2015 DIGGA CB01

  • » Listing Type: Used
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
Premium Ad
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sunshine West, VIC

03 9999 3372
MORE DETAILS
21

$320,000

2006 ATLAS COPCO E2C

  • » Listing Type: Used
  • » Category: Carrier Mounted
Location marker The shape of a location marker

Dubbo, NSW

02 8315 0022
MORE DETAILS
1

$1,210,000

XCMG XR240E

  • » Listing Type: New
Location marker The shape of a location marker

Sydney, NSW

02 8999 7036
MORE DETAILS
6

$1,210,000

XCMG XR240E ROTARY PILING RIG

  • » Listing Type: New
Location marker The shape of a location marker

Brisbane City, QLD

07 3177 1695
MORE DETAILS
6

$2,395

POWERTECH CORE DRILL 352D

  • » Listing Type: New
Location marker The shape of a location marker
Delivery Australia Wide
07 3085 2777
MORE DETAILS

Related Posts

Image: LINX Port Services

Herrenknecht tunnel boring machines arrive in Western Port

by Staff Writer
April 1, 2026

LINX Port Services has supported the delivery of the latest tunnel boring machines for the Suburban Rail Loop. The eagerly...

Attendees at No-Dig Down Under inspect drill rigs.

No Missing No-Dig

by Staff Writer
March 26, 2026

International No-Dig Auckland provides an unparalleled opportunity to connect with the global trenchless technology industry. Hosted each year in a...

Edge Underground is comfortably working at 1830mm, with plans for future development.

Edge Underground’s diameter evolution

by Staff Writer
March 23, 2026

From the beginning, Stuart Harrison and the Edge Underground team built their reputation on being able to repeatably and accurately...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Trenchless Australasia is the leading source of news and information in Australia and New Zealand. In addition to being the official publication of the Australasian Society for Trenchless Technology (ASTT) it is also the official media partner of the biggest specialist trenchless technology event in the Southern Hemisphere, No-Dig Down Under.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Us

  • Advertise
  • About
  • Contact
  • Subscribe
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • From the magazine
  • News
  • Featured
  • Utility location
  • Rehabilitation

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Feature Stories
    • Feature Stories
    • Horizontal directional drilling (HDD)
    • NDD – Non Destructive Digging
    • CIPP
    • Vacuum and hydro excavation
    • Rehab & repair
    • Microtunnelling
    • CCTV
    • Pipe jacking
    • Relining
    • Tunnel boring machines
    • Drain cleaning
    • Slip lining
    • Projects
    • Asset management
  • Trenchless Resources
    • Trenchless Resources
    • Tenders
    • Government announcements
    • Safety
  • Profiles
    • Velvet Underground
    • Women in Industry
  • Industry
    • Mergers & Acquisitions
    • Quarterly and half yearly results
    • People on the Move
    • ASTT
  • No-Dig
    • No-Dig Down Under
    • International No-Dig Auckland
  • Advertise
  • About
  • List Stock
  • Business Directory
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited